<strong>Tender</strong> <strong>No</strong>.: <strong>465S</strong>/<strong>2011</strong>/<strong>12</strong><br />
8.4 A test certificate must be filled in and handed to a <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong> Electricity Services<br />
Representative after the installation is complete.<br />
8.5 Two (2) weeks prior to the <strong>of</strong>ficial switch-on, there will be a “test run” in the presence <strong>of</strong> the <strong>City</strong> <strong>of</strong><br />
<strong>Cape</strong> <strong>Town</strong> Electricity Representative.<br />
8.6 The Contractor will be present at the <strong>of</strong>ficial switch-on in Adderley Street to ensure that everything is in<br />
order.<br />
9. WORKMANSHIP AND BEHAVIOUR<br />
9.1 The quality <strong>of</strong> work must be <strong>of</strong> the highest standard, and shall be guaranteed for a minimum period <strong>of</strong> 6<br />
months.<br />
9.2 Employees <strong>of</strong> the Contractor are required to be courteous and pr<strong>of</strong>essional on site, and are to be<br />
dressed neatly in a uniform manner that would reflect pr<strong>of</strong>essionalism.<br />
9.3 Any potential inconvenience to any member <strong>of</strong> public e.g. drive-way crossings must be discussed with<br />
the member <strong>of</strong> public in question before the commencement <strong>of</strong> work.<br />
10. CONTACTABILITY OF SITE SUPERVISION<br />
10.1 Site Supervisors must be provided with cell phones to facilitate easy communication with members <strong>of</strong><br />
the <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong> Electricity Services.<br />
11. SUBMISSION OF INVOICES<br />
11.1 The Contractor will be required to submit invoices and prescribed checklists on completion <strong>of</strong> the work<br />
for which he will be held responsible. The invoices and checklists will be countersigned by the <strong>City</strong> <strong>of</strong><br />
<strong>Cape</strong> <strong>Town</strong> Electricity Services after which it will be submitted to the accounts payable department.<br />
Attention is drawn to the payment conditions laid down by the Municipality.<br />
<strong>12</strong>. ADDITIONAL WORK<br />
<strong>12</strong>.1 On occasion the Contractor may be required to undertake work outside the scope <strong>of</strong> works. In these<br />
instances the Contractor must be prepared to undertake the work at the rate quoted in the pricing<br />
schedule.<br />
13. QUALITY CONTROL AND QUALITY PLAN<br />
13.1 The Contractor shall have a Quality Plan in operation. A copy <strong>of</strong> the plan must be submitted to the <strong>City</strong><br />
<strong>of</strong> <strong>Cape</strong> <strong>Town</strong> Electricity Services as part <strong>of</strong> the returnable document.<br />
13.2 The Contractor shall submit the results <strong>of</strong> the most recent audit on the quality plan with the returnable<br />
document. These audits shall be done by an accredited body which shall provide a certificate <strong>of</strong><br />
compliance after each audit.<br />
13.3 The quality plan shall be approved in terms <strong>of</strong> SANS 9001.Alternatively quality assurance systems may<br />
be considered but shall be to the approval <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong> Electricity Services.<br />
13.4 The <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong> Electricity Services reserves the right to carry out an inspection and inspect the<br />
premises <strong>of</strong> the Contractor. The purpose <strong>of</strong> the inspection shall be to acquaint the <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong><br />
Electricity Services that work is carried out in accordance to the plan and also to ensure that the<br />
contractor have the appropriate facility and equipment and is in a position to service the assets <strong>of</strong> the<br />
<strong>City</strong> Of <strong>Cape</strong> <strong>Town</strong> Electricity Services to acceptable standards. The contractor shall have the required<br />
Quality Management Documentation as required by ISO and/or SABS available during such<br />
inspections.<br />
54