12.07.2015 Views

Oakland Street Lighting Conversion Project - Navigator

Oakland Street Lighting Conversion Project - Navigator

Oakland Street Lighting Conversion Project - Navigator

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2. There will be a monthly evaluation of the contractor’s work to gauge the quality, safety anddelivery of service.3. Distribute PWA and <strong>Oakland</strong> <strong>Street</strong> <strong>Lighting</strong> <strong>Conversion</strong> <strong>Project</strong> material, and provide notice formerchants and others impacted in the work zone corridors. This should be done a week prior tothe work in the street.4. Participate in regularly scheduled meetings with PWA Electrical staff.5. Transfer the information on street lights that had been converted to LED on a monthly basis tothe <strong>Project</strong> Manager.a. This shall be accompanied by an updated electronic copy of OAKCHILD, the <strong>Street</strong> LightData Base in Access.b. This shall be accompanied by an updated electronic copy of OAKMAP, the <strong>Street</strong> Light GridMaps in AutoCAD.c. One paper copy of both items in (a) and (b).6. Provide the documentation of LED <strong>Street</strong> Lights conversion to PG&E for rebate and for electricbilling adjustment.7. Prepare final report and submit four copies to the Electrical Services Division no later than 3-monthsafter completion of installation. The final report should include final budget expenditures,narratives, data base collected for street lights, before and after photos taken at two randomly chosenlocations for each of the weeks the consultant is on the job and any other supporting documentation.The photos shall be taken from the same approximate angle at each location and shall demonstratethe work that is being performed. The photos shall be digitally transmitted by email to the <strong>Project</strong>Manager, with one copy of color print fully captioned and dated sent by US Mail or hand deliveredunder a transmittal form to the <strong>Project</strong> Manager.8. Disposal of Removed HPS Luminaire. Consultant shall dispose of all removed HPS luminaires at nocost to the City and in compliance with APPENDIX B - Public Works Specifications, Section401.1.39. Spare luminaires for City. Contractor shall provide 1% spare, i.e. approximately 300 luminaires inthe proportion in Section III.B.3, and deliver to the Municipal Service Center in Edgewater Dr.IV.THE PROPOSALA. Submittal RequirementsSubmit six (6) copies of responses and one (1) electronic copy of the proposal on disc or flash drive (MSWord or Excel format) in a sealed package.1. Transmittal Lettera. The Transmittal Letter shall be addressed to Mr. Paul Chan, <strong>Project</strong> Manager, PublicWorks Agency, 7101 Edgewater Drive, Building 2, <strong>Oakland</strong>, CA 94621. It shall bePage 12 of 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!