12.07.2015 Views

Oakland Street Lighting Conversion Project - Navigator

Oakland Street Lighting Conversion Project - Navigator

Oakland Street Lighting Conversion Project - Navigator

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX Bconstruction, the Engineer may withhold the retention payment until requested lists are received andapproved by the Engineer.The Contractor shall provide submittals showing the locking or theft-deterrent mechanisms to beinstalled on all City streetscape furniture such as trash receptacles, benches, tree grates, bollards,newspaper racks, etc. Such mechanisms shall be as recommended by the product manufacturer. Suchtheft-deterrent devices shall not pose a tripping hazard to pedestrians. The Contractor shall not order theseitems until the Engineer has approved the locking procedure detailed in the submittal.ADD NEW SUBSECTION 2-5.3.5 TO READ:2-5.3.5 Submittal Schedule. The Contractor shall, within fifteen (15) calendar days after receipt from theCity of the Notice to Proceed on this Contract, or another period of time as determined by the City, prepareand submit to the City, for Review and Concurrence, a comprehensive submittal schedule. This scheduleshall identify all submittal items required by the Contract, or as otherwise requested by the City.The submittal schedule shall include the date by which the item will be submitted to the City, whether thesubmittal is for approval or for record, the date by which approval is required, and the date by which thematerial or equipment must be on site in order not to delay the progress of the Work.In preparing the submittal schedule, the Contractor shall consider the nature and complexity of eachsubmittal item and shall allow adequate time for review, revision or correction, resubmittal, and approvalsufficiently in advance of the construction requirements in order not to delay the progress of the Work. Thesubmittal schedule shall allow adequate time for review of each submittal item prior to submittal to the City.Review and Concurrence of the submittal schedule is a precondition to the City making the first progresspayment under the payment provisions of this contract.ADD NEW SUBSECTION 2-5.3.6 TO READ:2-5.3.6 Certificates of Compliance. A Certificate of Compliance shall be furnished prior to the use of anymaterials for which these specifications or the special provisions require that a certificate be furnished. Inaddition, when so authorized in these specifications or in the special provisions, the Engineer may permit theuse of certain materials or assemblies prior to sampling and testing if accompanied by a Certificate ofCompliance. The certificate shall be signed by the manufacturer of the material or the manufacturer ofassembled materials and shall state that the materials involved comply in all respects with the requirementsof the specifications. A Certificate of Compliance shall be furnished with each lot of material delivered to thework and the lot so certified shall be clearly identified in the certificate.Materials used on the basis of a Certificate of Compliance may be sampled and tested at any time. Thefact that material is used on the basis of a Certificate of Compliance shall not relieve the Contractor ofresponsibility for incorporating material in the work which conforms to the requirements of the plans andspecifications, and any material not conforming to the requirements will be subject to rejection whether inplace or not.The City reserves the right to refuse to permit the use of material on the basis of a Certificate ofCompliance.The form of the Certificate of Compliance and its disposition shall be as directed by the Engineer.2-6 WORK TO BE DONE.ADD NEW PARAGRAPH TO THE END OF SUBSECTION 2-6 TO READ:Any work done beyond lines and grades established by the Engineer pursuant to the plans or any extrawork done without written authority of the Engineer, shall be considered as unauthorized work and nocompensation will be allowed therefor. The Engineer shall have the authority to have such work removedand the area restored, and to deduct the cost thereof from money due the Contractor.REPLACE SUBSECTION 2-8 WITH THE FOLLOWING:2-8 RIGHT-OF-WAY. The Contractor shall perform work within the public right-of-way or easements shownon the plans. The right to enter onto private property outside the public right-of-way or easement shall beobtained in writing from the property owner by the Contractor at the Contractor's expense. Mobilization andstaging areas outside the City right-of-way shall be obtained at the Contractor's expense.The Contractor shall be solely responsible for damages to persons or property occurring during or as aresult of the Contractor's entry onto private property outside the right-of-way or easement area.The Contractor shall defend and hold the City harmless from any and all claims, causes of action,demands or judgments resulting from the Contractor's entry onto private property outside the right-of-way oreasement area.<strong>Oakland</strong> <strong>Street</strong> <strong>Lighting</strong> <strong>Conversion</strong> <strong>Project</strong><strong>Project</strong> Special Provisions D-6 Bid Documents: Feb 2012 Update

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!