APPENDIX B2-9 SURVEYING.2-9.1 Permanent Survey Markers.REPLACE THE LAST SENTENCE OF THE FIRST PARAGRAPH OF SUBSECTION 2-9.1 WITH THEFOLLOWING:Markers that otherwise are lost or disturbed by its operations shall be replaced at the Contractor's expenseby a City survey crew or by a person licensed to practice land surveying in California as determined by theEngineer.2-10 AUTHORITY OF BOARD AND ENGINEER.ADD THE FOLLOWING THREE PARAGRAPHS TO SUBSECTION 2-10:No member of or Delegate of Congress, or Resident Commissioner shall be admitted to any share orpart of this contract or to any benefit that may arise there from, but this provision shall not be construed toextend to this contract if made with a corporation for its general benefit.No official of the City who is authorized in such capacity and on behalf of the City to negotiate, make,accept or approve, or to take part in negotiating, making, accepting or approving any architectural,engineering, inspection, construction or material supply contract or any subcontract in connection with theconstruction of the project, shall become directly or indirectly interested personally in this Contract or in anypart hereof. No officer, employee, architect, attorney, engineer or inspector of or for the City who isauthorized in such capacity and on behalf of the City to exercise any legislative, executive, supervisory, orother similar functions in connection with the construction of the project, shall become directly or indirectlyinterested personally in this contract or in any part thereof, any material supply contract, subcontract,insurance contract or any other contract pertaining to the project.Prior federal approval may be required on changes in the work and final acceptance.ADD NEW SUBSECTION 2-12 TO READ:2-12 GUARANTEE. The Contractor shall guarantee the work, in general, for one year after completion andacceptance by the City. The Contractor shall be held responsible for and must correct or repair any defectsarising or discovered in any part of its work within this one-year period after completion and acceptance ofthe work by the City of <strong>Oakland</strong>.On projects involving underground construction (such as pipe laying, electrical or liquid-carrying conduitinstallation, sewer repair, replacement or installation, trenching, backfilling, and paving, etc.), the Contractorshall guarantee the work, in general, for two years after completion and acceptance by the City. TheContractor shall be held responsible for and must correct or repair any defects arising or discovered in anypart of its work within this two-year period after completion and acceptance of the work by the City of<strong>Oakland</strong>.On projects involving both underground construction and above ground construction, only the workrelated to the underground portion of the total project will be covered by the two-year guarantee stated inparagraph two of this subsection. All other work on the project will be covered by the one-year guaranteestated in paragraph one of this subsection.ADD NEW SUBSECTION 2-13 TO READ:2-13 RE-INSPECTION AT THE END OF THE WARRANTY PERIOD. The Contractor shall include in thebid the cost for re-inspection of completed work just prior to the expiration period of the warranty. TheContractor and Engineer shall meet on the project site and together re-inspect all of the work just prior to theexpiration of the warranty period. If any warranty items are discovered then corrective work shall completedwithin 60 calendar days.SECTION 3 - CHANGES IN WORK3-1 CHANGES REQUESTED BY THE CONTRACTOR.REPLACE SUBSECTION 3-1.1 WITH THE FOLLOWING:3-1.1 General. The General Contractor shall submit to the Engineer, in writing, requests for changes inproducts, materials, equipment, and construction methods required by the contract documents. Theserequests for changes will be received and considered by the Engineer when the Contractor hasdemonstrated and/or indicated in writing that:the request does not require extensive revision to the contract documents;that the proposed changes are in keeping with the general intent of the contract documents; and<strong>Oakland</strong> <strong>Street</strong> <strong>Lighting</strong> <strong>Conversion</strong> <strong>Project</strong><strong>Project</strong> Special Provisions D-7 Bid Documents: Feb 2012 Update

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!