12.07.2015 Views

Oakland Street Lighting Conversion Project - Navigator

Oakland Street Lighting Conversion Project - Navigator

Oakland Street Lighting Conversion Project - Navigator

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX BADD NEW SUBSECTION 307-14.8 TO READ:307-14.8 Payment. Payment for Service Pedestal shall be made for each unit implemented complete withthe material, the foundation, conduit(s) for the utility service and conduits for street light/traffic signal, groundrod, pull rope, anchor bolts, and all other materials needed to complete the installation.REPLACE SUBSECTION 307-15.1 TO READ:307-15.1 General. Circuit breakers conforming to 209-3.11 shall be constructed at the locations shown onthe Plans. Circuit breakers used shall be enclosed in a Service Pedestal that conform to 209-3.10.2.307-16 STREET LIGHTING CONSTRUCTION.REPLACE SUBSECTION 307-16.2 WITH THE FOLLOWING:307-16.2 Pull Box Covers. Pull box covers shall be inscribed “CITY OF OAKLAND” “ELECTRICAL.”307-16.4 Wiring/Conductors.REPLACE THE THIRD PARAGRAPH OF SUBSECTION 307-16.4 WITH THE FOLLOWING:Each multiple lighting circuit shall be protected by a fuse mounted in a watertight inline fuse holderinstalled in each ungrounded conductor. The fuses shall be located in the adjacent curb box as shown onthe plans and be readily accessible. Fuse Splice Connectors shall meet the requirements of SpecialProvisions 209-4.3.2.307-16.7 Service.DELETE THE ENTIRE SUBSECTION307-16.8 Luminiares.REPLACE THE SUBSECTION 307-16.8.1 WITH THE FOLLOWING:307-16.8.1 General. HPS Luminiares shall conform to 209-4.4 in the General Provisions, and LEDLuminiares shall conform to 209-4.9 in the Special Provisions unless otherwise noted in the Plans andSpecifications.307-17 TRAFFIC SIGNAL CONSTRUCTION.307-17.1 General.ADD NEW SENTENCE TO THE END OF SUBSECTION 307-17.1 TO READ:City personnel shall energize and de-energize all traffic control circuits as needed and make anynecessary changes to the existing controller.307-17.3 Pull Box Covers.REPLACE SUBSECTION 307-17.3 WITH THE FOLLOWING:307-4.4 Pull Box Covers. Pull box covers to be installed in signal systems or combined signal and lowvoltagelighting systems shall be inscribed “CITY OF OAKLAND” “ELECTRICAL.”307-17.5 Wiring, Conductors and Cable.ADD TO THE END OF THE THIRD PARAGRAPH OF SUBSECTION 307-17.5.1:and approved splicing chambers.ADD NEW PARAGRAPH AT THE END OF SUBSECTION 307-17.5.1 TO READ:Each traffic signal circuit shall be protected by a fuse mounted in a watertight inline fuse holder installedin each ungrounded conductor. The fuses shall be located in the curb boxes as shown on the plans. Fusekit requirements are shown in the Standard Details.307-17.6 Signal Heads.CHANGE LAST PARAGRAPH OF SUBSECTION 307-17.6 TO READ:Side-mounted adapters shall be mounted on the standard quadrant facing the property line.Engineer must approve locations for traffic signal mounting before drilling.TheREPLACE SUBSECTION 307-17.6.2 WITH THE FOLLOWING:307-17.6.2 Signal Head Mountings. Signal head mounting assemblies shall be installed as shown on theplans and Standard Details.307-17.7.3 Inductive Loop Detectors.<strong>Oakland</strong> <strong>Street</strong> <strong>Lighting</strong> <strong>Conversion</strong> <strong>Project</strong><strong>Project</strong> Special Provisions D-38 Bid Documents: Feb 2012 Update

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!