- Page 1 and 2:
City of OaklandDeanna Santana, City
- Page 3 and 4:
I. REQUEST FOR PROPOSALS SUMMARYPro
- Page 5 and 6:
6. Capture of Savings. Document sav
- Page 7 and 8:
c. The PG&E Street Lights Data Base
- Page 9 and 10:
1.11 IESNA LM-79-08 - IESNA Approve
- Page 11 and 12:
3.4.8 Hinged access doors, capable
- Page 13 and 14:
2. There will be a monthly evaluati
- Page 15 and 16:
i. Project name and location.ii. Br
- Page 17 and 18:
a. Requirement - For this contract,
- Page 19 and 20:
workforce on Non-Construction Contr
- Page 21 and 22:
accordance with the Consultant Perf
- Page 23 and 24:
ecome the long term debt to be repa
- Page 25 and 26:
under the Public Records Act or Sun
- Page 27 and 28:
Print FormSCHEDULE EPROJECT CONSULT
- Page 29 and 30:
SCHEDULE OCONTRACTOR ACKNOWLEDGEMEN
- Page 31 and 32:
APPENDIX BCITY OF OAKLANDPUBLIC WOR
- Page 33 and 34:
APPENDIX Bset forth under the "Tota
- Page 35 and 36:
APPENDIX Bconstruction, the Enginee
- Page 37 and 38:
APPENDIX Bthe request is timely, fu
- Page 39 and 40:
APPENDIX Bused at the site of the e
- Page 41 and 42:
APPENDIX Bc. Direct equipment. The
- Page 43 and 44:
APPENDIX Bremove and dispose of the
- Page 45 and 46:
APPENDIX Bsafety, traffic, and prot
- Page 47 and 48:
APPENDIX BLiquidated damages shall
- Page 49 and 50:
APPENDIX Bprovided by the Resident
- Page 51 and 52:
APPENDIX Barea or shall be discharg
- Page 53 and 54:
APPENDIX BNothing specified herein
- Page 55 and 56:
APPENDIX BHazard Communication and
- Page 57 and 58:
APPENDIX BREPLACE SUBSECTION 7-11 W
- Page 59 and 60:
APPENDIX Bto subcontractors/ subcon
- Page 61 and 62:
APPENDIX BPART 2 - CONSTRUCTION MAT
- Page 63 and 64:
APPENDIX BOpen trench is performed
- Page 65 and 66:
APPENDIX BThe conduit runs shall be
- Page 67 and 68:
APPENDIX BADD NEW SUBSECTION 307-14
- Page 69 and 70:
APPENDIX BATTACHMENTSNo. Attachment
- Page 71 and 72:
APPENDIX BCONTR SUPPL Electrical Co
- Page 73 and 74:
APPENDIX BAttachment No. 3MATERIAL
- Page 75 and 76:
APPENDIX BAttachment 5As-Built Plan
- Page 77 and 78:
APPENDIX BAttachment 8: LIMITED OPE
- Page 79 and 80:
APPENDIX BContractor certifies that
- Page 81 and 82: APPENDIX Bf. Proof of InsuranceCont
- Page 83 and 84: APPENDIX BThe Contractor certifies
- Page 85 and 86: APPENDIX Bdeductible or self-insure
- Page 87 and 88: In the aggregate, progress payments
- Page 89 and 90: 7. Ownership of ResultsAny interest
- Page 91 and 92: 15. Indemnificationa. Notwithstandi
- Page 93 and 94: Disputed late payments are subject
- Page 95 and 96: iii.iv.Contractor shall immediately
- Page 97 and 98: origin, Acquired-Immune Deficiency
- Page 99 and 100: j. In the use of such recruitment,
- Page 101 and 102: deposited in the treasury or out of
- Page 103 and 104: (City of Oakland)Agency/DepartmentA
- Page 105 and 106: Department Head(Please Print Name o
- Page 107: EXHIBIT B - Billing Rates(insert bi
- Page 127 and 128: APPENDIX JAPPLICATION-BASED MATERIA
- Page 129 and 130: APPENDIX JAPPLICATION-BASED MATERIA
- Page 131: APPENDIX JAPPLICATION-BASED MATERIA
- Page 135 and 136: CITY OF OAKLANDPROJECT DELIVERY DIV
- Page 137: Schedule L1All Questions rated at