Oakland Street Lighting Conversion Project - Navigator
Oakland Street Lighting Conversion Project - Navigator
Oakland Street Lighting Conversion Project - Navigator
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
APPENDIX BAttachment 5As-Built Plans Certification FormSection 6-8Date:_____________________To:PWA , Construction and Field Services DivisionAttn: __________________________250 Frank H. Ogawa Plaza, Suite 4344<strong>Oakland</strong>, Ca 94612Re: <strong>Project</strong> No.: ___________<strong>Project</strong> Title: ____________________________________________________________________________________________________________________________________________________________________________________________________________________The enclosed As-Built plans are submitted as required by Section 6-8 “ Completionand Acceptance” of the contract specifications.As the representative of _____________________________________, the GeneralContractor for the above referenced project, I hereby certify that all improvement work forsaid project has been completed in conformance with the original plans and specificationsand changes noted on these As-Built plans.Signed:Title:____________________________________________________________________________________________Contractor’s License Number: _____________________________________________________________________________________<strong>Oakland</strong> <strong>Street</strong> <strong>Lighting</strong> <strong>Conversion</strong> <strong>Project</strong><strong>Project</strong> Special Provisions D-46 Bid Documents: Feb 2012 Update