12.07.2015 Views

Oakland Street Lighting Conversion Project - Navigator

Oakland Street Lighting Conversion Project - Navigator

Oakland Street Lighting Conversion Project - Navigator

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX BAll surety bonds, including bid, performance and payment bonds, must be furnished by a corporate suretyadmitted in the State of California or Lloyds of London, except as follows:If the contract award is $5,000,000 or less, the surety bond may be furnished by a United Statesnon-admitted corporate surety which appears on the Treasury List subject to the bonding limitswhich the Treasury List imposes on such surety; or,If the contract award is $1,000,000 or less, the surety bond may be furnished by a United Statesnon-admitted corporate surety which has an A.M. Best rating of A+; or,If the contract award is $500,000 or less, the surety bond may be furnished by a United Statesnon-admitted corporate surety that has an A.M. Best rating of A-.ADD THE FOLLOWING AFTER THE SECOND SENTENCE OF THE THIRD PARAGRAPH:The percentage of the Payment Bond shall be as listed on page A1 of the Notice Inviting Bids (or, for federalprojects, page B1 of the Notice to Contractors). The Payment Bond shall guarantee payment of all claims forlabor and material unfurnished, for amounts due under the Unemployment Insurance Act with respect tosuch work or labor, or any amounts required to be deducted, withheld and paid over to the Franchise TaxBoard from the wages of employees pursuant to Section 18806 of Revenue and Taxation Code with respectto such work and labor as required by the California Civil Code Section 3247, et. seq.REPLACE THE FOURTH PARAGRAPH WITH THE FOLLOWING:The percentage of the Performance Bond shall be as listed on page A1 of the Notice Inviting Bids (or, forfederal projects, page B1 of the Notice to Contractors). The Performance Bond shall guarantee faithfulperformance of all work, within the time prescribed, in a manner satisfactory to the Agency, and that allmaterials and workmanship will be free from original or developed defects. The Performance Bond mustremain in effect until the end of all warranty periods set forth in the Contract.2-5 PLANS AND SPECIFICATIONS.2-5.1 General.ADD THE FOLLOWING TO THE END OF SUBSECTION 2-5.1:All work shall be performed in compliance with all applicable (most recent editions) federal, state and localcodes, code amendments, and ordinances such as, but not limited to, the following:California Manual of Uniform Traffic Control Devices (MUTCD);Uniform Building Code, State Building Code,Uniform Plumbing Code,Uniform Mechanical Code,Uniform Fire Code,Uniform Electrical Code,"Work Area Traffic Control Handbook."Unless otherwise noted in the contract documents, the Uniform Building Code shall apply to the construction,alteration or repair of all City facilities including bridges, pedestrian walkways, and pumping stations.2-5.3 Submittals.ADD NEW PARAGRAPHS AT END OF SUBSECTION 2-5.3.3 TO READ:Attachment 1, the project submittal list, at the end of the Special Provisions details project submittalrequirements. This list is intended to be comprehensive, but no claim for completeness is implied, andsubmittal of each and every item on the lists shall not relieve the Contractor of supplying all informationneeded, or of complying with any of the other requirements of the specifications. Revised lists may beissued and items may be added to the list supplied.The Contractor shall use Attachment 2, the submittal transmittal form at the end of the SpecialProvisions, to certify that the proposed submittal meets the requirements of the project Special Provisionsand the Standard Specifications. This form indicates what party (i.e. Contractor = CONTR; Subcontractor =SUB) shall sign the transmittal form.The Contractor is responsible for providing all required submittals. The City may request additionalitemized lists of materials, equipment and fixtures furnished and installed by the Contractor. These requestsfor itemized lists shall be made in writing specifying the items and details required. The Contractor shallprovide these itemized lists within ten working days of the receipt of the written request. The Contractor’sfailure to provide said lists will delay payment to the Contractor until such lists are received. In the event thatmaterial, equipment and fixture lists are requested and not timely received at the conclusion of field<strong>Oakland</strong> <strong>Street</strong> <strong>Lighting</strong> <strong>Conversion</strong> <strong>Project</strong><strong>Project</strong> Special Provisions D-5 Bid Documents: Feb 2012 Update

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!