- Page 1 and 2:
C709 London 2007Setting-outprocedur
- Page 3 and 4:
PrefaceSetting-out procedures for t
- Page 5 and 6:
Roads: earthworks and drainage 95Ro
- Page 7 and 8:
ProfileProjection distanceShoulderS
- Page 9 and 10:
never work alone:- in confined spac
- Page 11 and 12:
Surveying instrumentsIt is assumed
- Page 13 and 14:
VerticalOptical tilting or automati
- Page 15 and 16:
Specialist tapesThe use of a certif
- Page 17 and 18:
Checks: physical and calculationThe
- Page 19 and 20:
Recording and informingKeeping reco
- Page 21 and 22:
Initial actionsBefore starting to s
- Page 23 and 24:
Instructing the site assistantA goo
- Page 25 and 26:
Difficult ambient conditionsPoor li
- Page 27 and 28:
Base and grid linesAlthough grid co
- Page 29 and 30:
Grid coordinatesThe ease of providi
- Page 31 and 32:
LinesLocation of control pointsCont
- Page 33 and 34:
Offset pegsNeed for offset pegsOrig
- Page 35 and 36:
Measurement with tapesTaping remain
- Page 37 and 38:
Horizontal anglesSimple techniquesS
- Page 39 and 40:
BenchmarksEach site should have a p
- Page 41 and 42:
Levelling instrumentsWhether the si
- Page 43 and 44:
Global Positioning System (GPS)GPS
- Page 45 and 46:
Profiles and travellersStandardisat
- Page 47 and 48:
Establishing the verticalVerticalit
- Page 49 and 50:
Circular curvesUsing the centre poi
- Page 51 and 52:
Obstructions and slopesAll possible
- Page 53 and 54:
LasersOnly a cursory overview of la
- Page 55 and 56:
Sewers and drains: initial checksBe
- Page 57 and 58:
Sewers and drains: line and levelCe
- Page 59 and 60:
Sewers and drains: junctionsEstabli
- Page 61 and 62:
Sewers and drains: manholesManholes
- Page 63 and 64:
Sewers and drains: common and deep
- Page 65 and 66:
Sewers and drains: Information shee
- Page 67 and 68: Buildings and structures: locationB
- Page 69 and 70: Buildings and structures: pilingRes
- Page 71 and 72: Buildings and structures: excavatio
- Page 73 and 74: Buildings and structures: slabs & f
- Page 75 and 76: Buildings and structures: columns a
- Page 77 and 78: Buildings and structures: tall stru
- Page 79 and 80: Buildings and structures: circular
- Page 81 and 82: Buildings and structures: curved wa
- Page 83 and 84: Roads: checking drawingsBefore sett
- Page 85 and 86: Roads: general proceduresProving th
- Page 87 and 88: Roads: line chronologyEstablishing
- Page 89 and 90: Roads: horizontal curvesCircular cu
- Page 91 and 92: Roads: vertical circular curvesIn t
- Page 93 and 94: Roads: levelsThe site engineer shou
- Page 95 and 96: Roads: earthworks and drainageExist
- Page 97 and 98: Roads: embankmentsSetting-out edge
- Page 99 and 100: Roads: cuttingsSetting-out edge peg
- Page 101 and 102: Roads: crossfallsIt is important to
- Page 103 and 104: Roads: footways and kerbsWhen roads
- Page 105 and 106: River works: bearing pilesRiver and
- Page 107 and 108: River works: sheet pilesMethod of i
- Page 109 and 110: Tunnelling: from ground levelTunnel
- Page 111 and 112: Tunnelling: constructing shaftsSett
- Page 113 and 114: Tunnelling: from shaftsTransferring
- Page 115 and 116: Tunnelling: gradients, profiles & l
- Page 117: Tunnelling: around curvesOffice pro
- Page 121 and 122: Appendix B: Care & checking of equi
- Page 123 and 124: Appendix C:National Grid, benchmark
- Page 125 and 126: Appendix D:Road layout: traditional
- Page 127 and 128: Appendix D:Road layout: traditional
- Page 129 and 130: Appendix D:Road layout: traditional
- Page 131 and 132: Appendix E: MOSS data for roadsData
- Page 133 and 134: Appendix F: use of computersThe use
- Page 135 and 136: Hand-held computersGiven the coordi
- Page 137 and 138: Appendix G: useful formulaeSimpsons
- Page 139 and 140: ICE/ICES (1997)Management of settin
- Page 141 and 142: CIRIA C709141
- Page 143: CIRIA C709143