12.07.2015 Views

Download - Engineering Surveyor

Download - Engineering Surveyor

Download - Engineering Surveyor

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Initial actionsBefore starting to set out the works, the following actions need to be taken:1. Review and become familiar with the drawings and check that:– the drawings are the latest issues– all essential dimensions are given (do not scale) and that intermediate dimensions agree with overalldimensions– the location of the works, in relation to permanent or temporary reference points, is adequately shownon the drawings– the level heights of the works, in relation to permanent features or temporary benchmarks, is shown– critical dimensions between related components are clearly indicated.2. Walk over the site checking that:– boundaries are well-defined and are as shown on the drawings– all permanent and temporary reference points and benchmarks are as shown on the drawings– all visible permanent features are correctly indicated on the drawings– any permanent or temporary features do not interfere with the setting-out or construction of the works– there is no evidence of hidden features that might affect the setting-out or construction of the works –(also check the contract documents for any warnings or cautions).3. Report any discrepancies found from the above checks in writing and keep a copy. It may take some timeto rectify discrepancies.4. Confirm any oral instructions in writing.5. Set up a system of recording and communicating information.6. Set up the CAD/computer-aided construction system. Check the files for function.7. Begin to train the setting-out team (if necessary).8. Set up and/or prove setting-out stations.9. Set up and/or prove site benchmarks.10. Record and agree existing site levels and features.11. Check that the works will tie in with any existing works.12. Plan the sequence of setting-out and how dimensions will be controlled.13. Make sure you are able and equipped to perform the work, for example are the instruments adequate, ingood working order and fully adjusted? Is your assistant properly trained? Are you properly trained? Haveyou sufficient resources?14. Do your thinking in the office before getting to the site.Note: Report immediately any errors in setting-out as soon as they are discovered. Early action to correct errors willminimise costs. Never conceal your errors or your doubts.CIRIA C70921

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!