12.07.2015 Views

Hurstville REF - Transport for NSW - NSW Government

Hurstville REF - Transport for NSW - NSW Government

Hurstville REF - Transport for NSW - NSW Government

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ESD PrincipleApplication to the proposalremoved if no longer required.Adverse impacts associated with the site and construction will beminor and measures to reduce impacts identified within this <strong>REF</strong>will be implemented during construction.Intergenerational equityConservation ofbiological diversity andecological integrityImproved valuation andpricing of environmentalresourcesThis proposal and the overarching DTRS project will contributetowards Tf<strong>NSW</strong>’s strategic benefits <strong>for</strong> current and futuregenerations, including safer public transport, by improving on thecurrent communications system, providing coverage and reliablecommunications services to all parts of the electrified rail networkand acting as the basis <strong>for</strong> the introduction of an Automatic TrainProtection System.The economic, social and safety considerations of the DTRS havebeen integrated with the consideration and assessment ofpotential environmental impacts regarding the development andoperation of the DTRS.The proposed site is on disturbed land that has been previouslycleared. Major clearing or other disturbance to the biodiversity oritems of ecological significance of the area is not required. Theproposed activity is not expected to result in loss of biodiversity orecological integrity.Tf<strong>NSW</strong> recognises the value of environmental sustainability andwill minimise the impact of its activities by ensuring appropriatemitigation measures are implemented <strong>for</strong> all aspects of the DTRSproject. The potential environmental costs of the proposal havebeen considered in conjunction with the costs of design,construction and operation.2.8 Other GuidelinesConsideration of the <strong>NSW</strong> Telecommunication Facilities Guideline including Broadband <strong>NSW</strong>(DoP 2010) is a requirement when Clause 114 or Clause 115 (development of atelecommunications facility) of the ISEPP is applied. The requirements of the guidelines havebeen considered and are included in Appendix 1.2.9 Licences and ApprovalsResponsible AuthorityApproval/Licence/PermitTf<strong>NSW</strong>Determination under Part 5 of the Environmental Planningand Assessment Act 1979Page 22 of 75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!