12.07.2015 Views

Hurstville REF - Transport for NSW - NSW Government

Hurstville REF - Transport for NSW - NSW Government

Hurstville REF - Transport for NSW - NSW Government

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

after approval from HSE Manager is obtained. Contaminated soil will be segregated in aspecial container be<strong>for</strong>e classification and disposal.The CEMP will further detail the proposed control measures.4.9 Hazardous MaterialsPotential ImpactsConstruction, operation and maintenance of the proposed facility will not require the use ofhazardous chemicals and/or materials.If not properly used, chemicals may present a risk to the safety of workers and the environmentin general. Safe use of hazardous chemicals is regulated and subject to numerous standards,including a need <strong>for</strong> a dangerous goods licence.Control MeasuresIf hazardous materials are required <strong>for</strong> any un<strong>for</strong>eseen reason, a hazardous wastemanagement plan would be prepared. The plan will detail terms applying to the purchase,storage, use, handling and disposal of such materials.The impact of hazardous materials will be minimised through a range of control measuresincluding, but not limited to, those outlined below.Hazardous materials will be properly classified and managed in accordance withrequirements <strong>for</strong> their particular class.An evaluation of alternative materials will be undertaken be<strong>for</strong>e use of chemicals isapproved.Hazardous materials will be transported, stored and used in accordance with thecorresponding material safety data sheets which will be available on the site.Hazardous materials will be stored in a locked and bundled area at the site; incompatiblechemicals will not be stored together.No fuels will be stored on site. Refuelling will be undertaken at off-site facilities.Adequate spill prevention, containment and response measures (e.g. drip trays) will beprovided on site if needed.Construction personnel will be trained in spill containment and response procedures.All storage and handling equipment on site will be maintained properly.4.10 Visual Aesthetics and Urban DesignExisting SituationPage 46 of 75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!