4.21 Implementation ProcessThe construction contractor will incorporate the mitigation and control measures in this <strong>REF</strong> intothe program wide CEMP (if not already included), and the site specific ECM as appropriate. TheCEMP and ECM will be the key environmental management documents followed by the ProjectManager during construction and commissioning to ensure appropriate environmentalmanagement practices are implemented.A copy of this <strong>REF</strong>, the program wide CEMP and the ECM are to be retained on site andproduced upon request. The CEMP and/or ECM will include:• details of environmental controls to be implemented including location and timing• details of statutory requirements including those of any approvals and licences• assignment of responsibility <strong>for</strong> implementation and monitoring of environmental controls• reporting and emergency procedures• contact details <strong>for</strong> all site personnel and agency contacts• corrective action requirements and their verification.Page 64 of 75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!