12.07.2015 Views

Hurstville REF - Transport for NSW - NSW Government

Hurstville REF - Transport for NSW - NSW Government

Hurstville REF - Transport for NSW - NSW Government

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PrincipleProposalaerodrome or airport operating within 30kilometres of the proposed development andreported to the Civil Aviation Safety AuthorityAustralia.(b) The telecommunications facility is not tocause adverse radio frequency interferencewith airport, port or Commonwealth Defencenavigational or communications equipment,including the Morundah CommunicationFacility, Riverina.(c) The telecommunications facility andancillary facilities are to be carried out inaccordance with the applicable specificationsof the manufacturers <strong>for</strong> the installation ofsuch equipment.(d) The telecommunications facility is not toaffect the structural integrity of building onwhich it is erected.(e) The telecommunications facility is to beerected wholly within the boundaries of aproperty where the landowner has agreed tothe facility being located on the land.(f) The carrying out of construction of thetelecommunications facilities must be inaccordance with all relevant regulations of theBlue Book – ‘Managing Urban Storm water:Soils and Construction’ (DECC 2008), or itsreplacement.(g) Obstruction or risks to pedestrians orvehicles caused by the location of the facility,construction activity or materials used inconstruction are to be mitigated.Tf<strong>NSW</strong> will operate the radio facility with itsown spectrum and the facility will not causeinterference with other networks. All radiotransmitters will use the frequency assigned toTf<strong>NSW</strong> <strong>for</strong> the exclusive use of Tf<strong>NSW</strong>.The installation and operation of the radioequipment and antennas will be carried out inaccordance with the manufacturers’specifications.The proposed facility will not be connected toan existing building.The proposed facility will be inside the railcorridor that is owned by Tf<strong>NSW</strong>. Tf<strong>NSW</strong> isthe proponent of the network and agrees tothe use of the land <strong>for</strong> the proposed radioequipment.The activities associated with construction andinstallation will be done in accordance withsediment controls, erosion controls,stormwater controls and other controlsoutlined in the Blue Book (refer Section 4.1).Construction activities will take place in the railcorridor and changes to traffic and access arenot expected.Traffic changes will be implemented inaccordance with an approved TrafficManagement Plan.Page 70 of 75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!