12.07.2015 Views

Hurstville REF - Transport for NSW - NSW Government

Hurstville REF - Transport for NSW - NSW Government

Hurstville REF - Transport for NSW - NSW Government

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Factor (Commonwealth Legislation) Impacts Comments(g) Environmental impact on aCommonwealth marine area?(h) Direct or indirect effect onCommonwealth land?NoNoThe site is not in the vicinity ofCommonwealth marine areas.The site is not on or close toCommonwealth land.4.20 Summary of Control MeasuresLand<strong>for</strong>ms, Geology and SoilsAll spoil will be transferred directly to skip bins or stockpiled appropriately.Appropriate stockpiling of materials will take place away from drainage lines,waterways and drains.Soil that may be contaminated or weed infested will be stockpiled separately be<strong>for</strong>ebeing removed from the site.Sediment fences and bunds will be installed and inspected regularly.The tracking of soils on public roads will be prevented by using appropriate shakergrids/ballast pads.Soil will be removed from public roads and other paved areas using dry streetsweepers or other measures.Disturbed areas will be reinstated, if required.During maintenance activities, spills will be attended to and treated in an appropriateand timely fashion in accordance with Tf<strong>NSW</strong> procedures.Water Quality and HydrologyA Water Management Plan will be prepared be<strong>for</strong>e construction begins to determinethe most appropriate method <strong>for</strong> water disposal should groundwater be encounteredduring pile boring activities.A geological engineer will be present during the boring of the pile and work will ceaseimmediately if groundwater is encountered. The water will be tested according toindustry standards to determine the presence of contaminants or other materials. Thiswill determine the most appropriate method of water disposal. If water is encountered,special construction methodologies will be adopted to prevent a continuing flow ofgroundwater to the surface.Page 57 of 75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!