12.07.2015 Views

Hurstville REF - Transport for NSW - NSW Government

Hurstville REF - Transport for NSW - NSW Government

Hurstville REF - Transport for NSW - NSW Government

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Principle(e) A telecommunications facility should belocated and designed to respond appropriatelyto its rural landscape setting.(f) A telecommunications facility located on, oradjacent to, a State or local heritage item orwithin a heritage conservation area, should besited and designed with external colours,finishes and scale sympathetic to those of theheritage item or conservation area.(g) A telecommunications facility should belocated so as to minimise or avoid theobstruction of a significant view of a heritageitem or place, a landmark, a streetscape, vistaor a panorama, whether viewed from public orprivate land.(h) The relevant local government authoritymust be consulted where the pruning, lopping,or removal of tree or other vegetation wouldcontravene a Tree Preservation Orderapplying to the land or where a permit ordevelopment consent is required.(i) A telecommunications facility that is nolonger required is to be removed and the siterestored, to a condition that is similar to itscondition be<strong>for</strong>e the facility was constructed.(j) The siting and design oftelecommunications facilities should be inaccordance with relevant Industry DesignGuides.ProposalThe proposed site is not in a rural area. It is inthe rail corridor adjacent to a residential andcommercial area.The proposed DTRS site is not located withinor adjacent to a Heritage item.The proposed facility will not block orsignificantly obstruct views of heritage items orother landmarks of state significance.The proposed monopole is less than 500millimetres wide at the top and will not have aheadframe supporting the antennas. Themonopole will not represent a dominantstructure in the view lines of people occupyingthe residential properties in the surroundingarea.No native vegetation will be removed.Should the facility ever become redundant, thevarious elements will be decommissioned andremoved. Following removal, the land will berestored as close as practicable to itscondition be<strong>for</strong>e work began.The proposed design has been completedusing “best industry practice” and complieswith the relevant standards regardingstructural engineering, EME and constructionprocedures.Page 67 of 75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!