Figure 5View of proposed facility looking west across the rail corridorControl MeasuresVisual impact will be minimised through a range of control measures which will include, but willnot be limited to, those outlined below.The work area shall be maintained in an orderly manner.All temporary signage associated with the works must be appropriately displayed.All work equipment and materials will be contained within the designated boundaries of thework site.All waste generated during the course of the works will be removed from the work areas assoon as practicable or at the end of each work day and disposed of in accordance with themeasures identified <strong>for</strong> ‘Waste’.On completion of work, all vehicles, materials and refuse relating to the works will beremoved and the site reinstated to the pre-work condition if not better.4.11 Land UseExisting SituationThe proposed site is on land owned by Tf<strong>NSW</strong> and zoned <strong>for</strong> the purposes of City BusinessCentre under the <strong>Hurstville</strong> LEP. The land where the new monopole and cabinets are to besituated and where trenching is required is not actively used <strong>for</strong> Tf<strong>NSW</strong> activities (i.e. an accessPage 48 of 75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!