12.07.2015 Views

Part 2

Part 2

Part 2

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

352 Installation and Mainframe ConfigurationRS4491423 OPERATION - LINES REQUIREDLINES REQUIRED FOR DIRECT CONNECTIONSend DataGround for Send DataReceived DataGround for Received DataSignal GroundLINES REQUIRED FOR MODEM OPERATIONSend DataGround for Send DataReceived DataGround for Received DataSignal GroundTerminal ReadyGround for Terminal ReadyReceiver ReadyGround for Receiver ReadyRequest to SendGround for Request to SendClear to SendGround for Clear to SendData ModeGround for Data ModeCable length limits imposed by RS4491423 operation depend on the speed of operation,as shown in Figure 66. For example, with a cable length of 4000 feet (1220meters), maximum operating speed is 1000 bits per second. After the cable has beenselected, connect the cable to the 3497A rear panel connector. This completes theinstallation for RS4491423 operation.Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!