RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Primary Conductors: <strong>Underground</strong> conductors between the Power Company’ssubstation and the Power Company’s distribution transformers. Depending on thearea, these conductors are energized between 4,200 volts and 34,500 volts.Secondary Conductors: <strong>Underground</strong> conductors between the Power Company’sdistribution transformers and secondary boxes. Depending on the customer’sapplication, these conductors are energized between 120 and 480 volts.Service Entrance Conductors: <strong>Underground</strong> conductors between the customer’sservice equipment terminals and the Power Company’s source (a distributiontransformer or a secondary box). For more information regarding service entranceconductors and conduit please refer to the Power Company’s Electric ServiceRequirements at www.rockymountainpower.net/con/esr.<strong>Procedure</strong>Figure 1.3.1 – Primary, Secondary, and Service Conductor SchematicPrimary and Secondary Equipment Associated with <strong>Conduit</strong> <strong>System</strong>sDistribution Transformer: A voltage device that converts power from a primaryvoltage to a secondary voltage. The secondary side of the transformer is used toserve individual customers either directly or via a secondary box. See figure 1.3.1.Sectionalizing Cabinet (Ground Sleeve): A primary voltage device used as ajunction for two or more primary cables. A ground sleeve cannot be used to serve acustomer.Switchgear: A primary voltage device used as either a switch point or protectionpoint for two or more primary cables. Switchgear cannot be used to serve acustomer.J:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!