13.07.2015 Views

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6.3 Installing <strong>Conduit</strong> through PavementFor conduit through pavement or concrete requirements, see section 2.2.11, <strong>Conduit</strong>through Pavement.<strong>Procedure</strong>Figure 6.3 – Installing <strong>Conduit</strong> through Concrete6.4 Pull Line, Proofing, and Sealing the <strong>Conduit</strong>For conduit sealing and pull line requirements, see sections 2.2.3, Dirt and Debrisand 2.2.4, Pull Rope. For conduit proofing requirements, see section 2.2.7, <strong>Conduit</strong>Proofing.<strong>Conduit</strong> plugA pull line capable ofwithstanding 500 lbs. oftension, installed withsix feet of extra lineextending from eachend of the conduit. Thepull line shall be securedbefore the ends areplugged.Figure 6.4.1 – <strong>Conduit</strong> Plug and Pull LineJ:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!