13.07.2015 Views

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Company is required to return to the site to repair the conduit system, the customer will beheld liable.5.1 Trenching – Call Before You Dig – 811For trenching requirements see section 2.3, Trench and Backfill Requirements.<strong>Procedure</strong>The trench bottom should be level and well tamped.Figure 5.1.1 – Typical Primary Conductor TrenchThe trench should be level and well tamped.J:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!