13.07.2015 Views

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11 Secondary Box – Customer ResponsibilityThe drawings and pictures in this section represent typical installations. If you have anyquestions about any drawing or picture, please contact the Power Company.<strong>Procedure</strong>The Power Company does not allow the customer to install the secondary box.The left picture in Figure 11 shows a properly installed three phase sectionalizing cabinet.Above Grade PedestalFlat Lid – Not for new construction11.1 Pad Box Dimensions – Secondary BoxFigure 11 - Secondary BoxesSecondaryBox Base21.5” 13”25.5”Above GradePedestalFigure 11.1 - Secondary Box Base DimensionsJ:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!