13.07.2015 Views

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Push conduits together until they are seated.<strong>Procedure</strong>6.2 Installing <strong>Conduit</strong> to Energized EquipmentFigure 6.1.2 – Seating the <strong>Conduit</strong>For conduit to energized equipment requirements, see section 2.2.9, <strong>Conduit</strong> toExisting EquipmentA conduit left two feetfrom existing energizedequipment. This is requiredfor safety reasons. Notshown in this picture is thesweep and additionalconduit left to completethe installation into theenergized equipment.In this case the conduit issealed wit duct tape withthe pull rope taped to theinside wall of the conduitFigure 6.2 – Installing <strong>Conduit</strong> to Existing (Energized) EquipmentJ:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!