RMP Underground Conduit System Installation Guide (Procedure 242)
RMP Underground Conduit System Installation Guide (Procedure 242)
RMP Underground Conduit System Installation Guide (Procedure 242)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Procedure</strong>Figure 9 - Single Phase Sectionalizing Cabinet9.1 Pad Box Dimensions – Single Phase Sectionalizing CabinetPad box dimensionsTop ViewFront View48”32”31”17”32”52”Figure 9.1 - Single Phase Sectionalizing Cabinet Pad Box DimensionsJ:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 40