Above-Ground <strong>Conduit</strong> and Sweep Applications 1Application 2 Type of <strong>Conduit</strong> . Sweep MaterialThree Phase Primary Fiberglass or PVC FiberglassSingle Phase Primary 3 Fiberglass or PVC Fiberglass or PVCSecondary 3 Fiberglass or PVC Fiberglass or PVC<strong>Procedure</strong>1 Above-ground applications are installed by the Pow er Company2 The Pow er Company reserves the right to require steel conduit in non-typical applications such as abridge crossing.3 Fiberglass can tolerate higher sidew all pressure than PVC. Longer conduit runs or conduit runs w ithmultiple turns may require fiberglass sw eeps. The Pow er Company reserves the right to specify w hichsw eep is required.<strong>Conduit</strong>Diameter(in)Table 2.2.5.3 – Sweep SpecificationsAcceptable Elbow Sweeps 1SecondaryConductor<strong>Conduit</strong> (in)Primary Conductor<strong>Conduit</strong> (in)In Trench RiserWhenPVC isUsed 1WhenFiberglassis Used 12 Note 2 36 36 40 n/a36 363 48 48 36 40 0.0936 36PVCSchedule4 48 48 36 40 0.0948n/a6 60 48 40 0.111. Long radii sw eep elbow sizes are based on cable sidew all pressure- bearinglimitations. Depending on pulling calculations, the Pow er Company may require alarger radius sw eep or specify w hich material the sw eep should be made of.2. It is not recommended to use 2” conduit for secondary.MinimumFiberglassWallThickness(in)J:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!