<strong>Procedure</strong>Figure 13.1 – Padvault13.2 Excavation – PadvaultsPad vaults are designed to be set such that the top of the pad is three inches abovethe final grade in non-pedestrian areas and flush with the final grade in pedestrianareas. Pad vaults should be level and supported by six inches of ¾-inch-minusgravel backfill, compacted to 90% of dry density, placed over undisturbed earth.Figure 13.2 - Excavation – PadvaultJ:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!