13.07.2015 Views

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Pull line (500lb test)Mandrel being pulledthrough a conduitriser.<strong>Procedure</strong>Figure 6.4.2 – <strong>Conduit</strong> ProofingPlugging the ends of theconduit.Figure 6.4.3 – Plugging the <strong>Conduit</strong>J:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!