13.07.2015 Views

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

9.3 Customer Installs Pad Box – Single Phase Sectionalizing CabinetThe customer will install the pad box and conduits as shown in Figures 9.3.1 to 9.3.3.Note that the number of conduits may vary depending on the infrastructure design.Notes:For each conduit run:•One 45° elbow permanently attached•Elbow should terminate 6”-10” inside the pad box asshown.Equipment base leveled to 29" below final gradeEquipment base must be supported by compacted ¾ “ minusbackfillNot drawn to scaleLegendOpen ExcavationBackfill<strong>Conduit</strong>Pad BoxTop of Pad Box<strong>Procedure</strong>6”-10”45° ElbowThe customer isresponsible to installthe bonding wire.Reference section 7.7.38”52”Figure 9.3.1 - Top View - Single Phase Sectionalizing Cabinet Pad BoxJ:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!