RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8.2 Excavation – Three Phase Sectionalizing CabinetThe customer will excavate a 7’ x 10’ hole to the appropriate depth.Notes:Legend<strong>Procedure</strong>Excavate the pad box hole to at least 29” below finalgrade plus the size of the largest conduit (3” – 6”).Open ExcavationNot drawn to scale7'Trench<strong>Conduit</strong>10’Figure 8.2 – Excavation Dimensions - Three Phase Sectionalizing Cabinet8.3 Customer Installs Pad BoxThe customer will install the pad box and conduits as shown in Figures 8.3.1 to 8.3.3.Note that the number of conduits may vary depending on the infrastructure design.J:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!