13.07.2015 Views

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Procedure</strong>Note the spoil set backfrom the edge of thetrench.Joint use conduit and cables should be at least 12” from primaryand secondary conduits.Figure 6.5.3 – Joint Use SeparationJ:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!