RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Procedure</strong>Sweep too close to the pole.7 Equipment Bases – General InformationFigure 6.6.3 - Riser Too Close to Pole7.1 Site SelectionThe site shall be inspected prior to selecting the equipment base or determining theinstallation details. The job sketch and associated documents should clearly identifyeach equipment base and location. The Power Company is responsible to design thejob and determine the location of the equipment; however, input from the customer isvaluable. Customer input will be reviewed and, if possible, incorporated into thedesign prior to the final design. The following items should be included in theinspection and accounted for in the job design:• Soil class. Soil stability shall be determined and recommendations made onshoring or sloping requirements.• Water table. Precautions should be taken to prevent any flooding affectingcustomer-owned equipment in adjacent structures or properties.• Frost considerations: Consideration shall be given to local ground and frostconditions such that the installation remains structurally sound.• Final grade. If the final grade has not yet been established, measures shall bemade to allow for anticipated grade changes. Where radical changes in gradeare anticipated, installation should be delayed until near-final grade has beenachieved.J:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!