Notes:For each conduit run:•Leave 10’ of trench left open•Provide one 45° elbowExcavation depth should be 29” plus the sizeof the largest conduit (3” – 6”).10'LegendOpen ExcavationBackfill<strong>Conduit</strong>3/4” minus leftfor leveling<strong>Procedure</strong>The Power Company will cut conduit asneeded to install the elbows.Not drawn to scale7'Trench<strong>Conduit</strong>10'10'Figure 8.4 – Top View - Three Phase Sectionalizing Cabinet9 Single Phase Sectionalizing Cabinet Equipment Base - Customer ResponsibilityThe drawings and pictures in this section represent typical installations. If you have anyquestions about any drawing or picture, please contact the Power Company.Figure 9 shows a properly installed single phase sectionalizing cabinet.J:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!