RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

RMP Underground Conduit System Installation Guide (Procedure 242)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Notes:For each conduit run:•2’ of trench left open•90° elbow permanentlyattached to each conduit runExcavation depth should be 10” plus thesize of the largest conduit (3” – 4”).2'LegendOpen ExcavationBackfill<strong>Conduit</strong>3/4” minus leftfor leveling<strong>Procedure</strong>Not drawn to scale4'Trench<strong>Conduit</strong>90° elbow2’4'Figure 11.4.1 - Top View - Secondary BoxNotes:All conduits need to come up into the center of theexcavation where the pad box will be placed.The Power Company will cut the elbows as needed.Final GradeMinimum depth =10” + conduitdiameterFigure 11.4.2 - Side View - <strong>Conduit</strong> Placement - Secondary BoxJ:\Publications\FPP\DIS\PRO\<strong>242</strong>-<strong>RMP</strong> <strong>Underground</strong> <strong>Conduit</strong> <strong>System</strong>s.docx R6, 5/13/14This document is posted online at rockymountainpower.net, and at engineering’s intranet site for distribution procedures.Modification of this document must be authorized by PacifiCorp engineering publications, (503) 813-5293. 52

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!