13.07.2015 Views

CJ2 CPU Unit Software User's Manual - CIP ETI

CJ2 CPU Unit Software User's Manual - CIP ETI

CJ2 CPU Unit Software User's Manual - CIP ETI

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10 <strong>CPU</strong> <strong>Unit</strong> Functions10-2 Cycle Time/High-speed Processing10-2-1 Minimum Cycle TimeA minimum (or fixed) cycle time can be set in PLCs. Variations in I/O response times can be eliminatedby repeating the program with a fixed cycle time.The minimum cycle time (0.1 to 32,000 ms) is specified in the PLC Setup in 0.1-ms units.Minimum cycle time(Effective)Minimum cycle time(Effective)Actual cycle time Actual cycle timeMinimum cycle time(Effective)Actual cycle timeIf the actual cycle time is longer than the minimum cycle time, the minimum cycle time function will beineffective and the cycle time will vary from cycle to cycle.10-2 Cycle Time/High-speedProcessing1010-2-1 Minimum Cycle TimeMinimum cycle timeMinimum cycle timeMinimum cycle time(Effective)Actual cycle time(Effective)Actual cycle time(Effective)Actual cycle time PLC SetupWhen using the CX-Programmer, make the settings on the Timings/Synchronous Tab Page.<strong>CJ2</strong> <strong>CPU</strong> <strong>Unit</strong> <strong>Software</strong> User’s <strong>Manual</strong>10-7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!