the overall goal of design, modeling, demonstration, <strong>and</strong> analysis of this melting<br />

technology.<br />

Year 1 Year 2 Year 3<br />

Task Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4<br />

1 Modeling<br />

2 Melter Design<br />

3 Procurment<br />

4 Physical Modeling<br />

5 Fabrication<br />

6 Shakedown<br />

7 Test Planning<br />

8 Testing - Parametric<br />

9 Melter Modification<br />

10 Second Test Series<br />

11 Analysis<br />

12 Toward Commercialization<br />

Milestones are placed at the end of many project tasks to help sponsors <strong>and</strong> team<br />

members evaluate project technical progress on time <strong>and</strong> financial tracking. The<br />

milestones shown below will serve throughout the project as a gauge to successful<br />

completion of the work.<br />

Year 1<br />

Milestones<br />

Year 2<br />

Milestones<br />

Year 3<br />

Milestones<br />

• Complete CFD model to be used by team members to design pilot<br />

scale melter<br />

• Design pilot scale melter<br />

• Procure all equipment <strong>and</strong> components for the melter in preparation for<br />

fabrication<br />

• Fabricate <strong>and</strong> shake down of the pilot scale melter<br />

• Prepare test plan including compositions of glasses to be melted<br />

• Finish all pilot scale melting tests <strong>and</strong> collect samples for analysis<br />

• Complete detailed analyses of product glass properties <strong>and</strong> quality<br />

• Modify melter, as needed, for second test series<br />

• Finish second test series, including at least one long term test, <strong>and</strong> all<br />

glass analysis<br />

• Finalize CFD model of the melter usable by all CFD operators<br />

• Finish physical material <strong>and</strong> energy balance model of next generation<br />

melting system (NGMS) process including utilizing waste heat for<br />

oxygen production<br />

• Complete plan for commercialization, including needed developments<br />

<strong>and</strong> stages<br />

Go-no-go decision points are placed at the end of the first <strong>and</strong> second years of the project.<br />

At these times, the project team <strong>and</strong> sponsors have the opportunity to assess project<br />

progress <strong>and</strong> decide on continued work in the next phase (or year) of the project. The<br />

project team has every confidence that all project technical targets <strong>and</strong> milestones will be<br />

reached.<br />