V. Corrections to Echo Soundings<br />
Instrument corrections<br />
An initial leadline confidence check was measured against the EM1002<br />
multibeam echosounder prior to the start of field operations on March 28, 2009 while tied<br />
up at Isla De Vieques, Puerto Rico. The purpose of this check was to verify the system<br />
during static conditions by confirming that the digital depths being recorded reflected the<br />
actual depths. A sound velocity cast <strong>and</strong> leadline was per<strong>for</strong>med on the starboard side of<br />
the multibeam system. The sonar’s acquisition system was logging data while the<br />
leadline were per<strong>for</strong>med. The CARIS swath editor was then used to verify the depth<br />
soundings. Soundings were queried approximately 4.1 meters to starboard of the nadir<br />
beam <strong>and</strong> verified to the leadline values. No instrument correction was necessary<br />
because of insufficient evidence of systematic error.<br />
A leadline was unable to be per<strong>for</strong>med <strong>for</strong> the 7125 due to sight limitations <strong>and</strong><br />
deployment issues. Vertical elevations were verified with a check line against the<br />
EM1002.<br />
Sensor Offsets<br />
On the February 7 th , 2006 the NOAA Ship NANCY FOSTER had her sensor<br />
offsets surveyed by the Power & Control Systems Group of L3 Communications. The<br />
IMU, GPS antennas, EM1002 transducer <strong>and</strong> the center of rotation were surveyed with<br />
respect to the RP of the vessel. The values obtained from the vessel survey are<br />
documented in Appendix G & H.<br />
On March 10, 2009 the NGS Field Operation Branch conducted an additional survey <strong>for</strong><br />
the second IMU. The field crew based there observations on alignment cubes <strong>and</strong> the<br />
coordinate report from the L3 Communications survey. The values obtained from the<br />
vessel survey are also documented in Appendix G & H.<br />
These offsets were entered into the MERLIN acquisition software, POS/MV<br />
software <strong>and</strong> into the Caris vessel configuration file in the appropriate areas. The offsets<br />
used <strong>for</strong> the sonar’s <strong>and</strong> positioning systems are documented Appendix A, C <strong>and</strong> E.<br />
Static <strong>and</strong> Dynamic Draft Corrections<br />
Static draft values were obtained from visual observations of the projection draft<br />
marks on the starboard side of the NANCY FOSTER <strong>for</strong> the EM1002. The static draft<br />
recorded on March 28, 2009 was 3.66m while tied up at Isla de Vieques, Puerto Rico.<br />
Subtracting the initial draft value of 3.66m from the fixed offset (1.68m) <strong>for</strong> the<br />
Reference Point to the EM1002 gives the final draft reading of -1.98m, which was<br />
entered into the MELIN software <strong>and</strong> confirmed with the leadline procedure previously<br />
discussed. The final EM1002 draft reading at the end of the cruise (April 2 nd ) was<br />
negligible.<br />
11