V. Corrections to Echo Soundings<br />

Instrument corrections<br />

An initial leadline confidence check was measured against the EM1002<br />

multibeam echosounder prior to the start of field operations on March 28, 2009 while tied<br />

up at Isla De Vieques, Puerto Rico. The purpose of this check was to verify the system<br />

during static conditions by confirming that the digital depths being recorded reflected the<br />

actual depths. A sound velocity cast <strong>and</strong> leadline was per<strong>for</strong>med on the starboard side of<br />

the multibeam system. The sonar’s acquisition system was logging data while the<br />

leadline were per<strong>for</strong>med. The CARIS swath editor was then used to verify the depth<br />

soundings. Soundings were queried approximately 4.1 meters to starboard of the nadir<br />

beam <strong>and</strong> verified to the leadline values. No instrument correction was necessary<br />

because of insufficient evidence of systematic error.<br />

A leadline was unable to be per<strong>for</strong>med <strong>for</strong> the 7125 due to sight limitations <strong>and</strong><br />

deployment issues. Vertical elevations were verified with a check line against the<br />

EM1002.<br />

Sensor Offsets<br />

On the February 7 th , 2006 the NOAA Ship NANCY FOSTER had her sensor<br />

offsets surveyed by the Power & Control Systems Group of L3 Communications. The<br />

IMU, GPS antennas, EM1002 transducer <strong>and</strong> the center of rotation were surveyed with<br />

respect to the RP of the vessel. The values obtained from the vessel survey are<br />

documented in Appendix G & H.<br />

On March 10, 2009 the NGS Field Operation Branch conducted an additional survey <strong>for</strong><br />

the second IMU. The field crew based there observations on alignment cubes <strong>and</strong> the<br />

coordinate report from the L3 Communications survey. The values obtained from the<br />

vessel survey are also documented in Appendix G & H.<br />

These offsets were entered into the MERLIN acquisition software, POS/MV<br />

software <strong>and</strong> into the Caris vessel configuration file in the appropriate areas. The offsets<br />

used <strong>for</strong> the sonar’s <strong>and</strong> positioning systems are documented Appendix A, C <strong>and</strong> E.<br />

Static <strong>and</strong> Dynamic Draft Corrections<br />

Static draft values were obtained from visual observations of the projection draft<br />

marks on the starboard side of the NANCY FOSTER <strong>for</strong> the EM1002. The static draft<br />

recorded on March 28, 2009 was 3.66m while tied up at Isla de Vieques, Puerto Rico.<br />

Subtracting the initial draft value of 3.66m from the fixed offset (1.68m) <strong>for</strong> the<br />

Reference Point to the EM1002 gives the final draft reading of -1.98m, which was<br />

entered into the MELIN software <strong>and</strong> confirmed with the leadline procedure previously<br />

discussed. The final EM1002 draft reading at the end of the cruise (April 2 nd ) was<br />

negligible.<br />

11