- Page 1: Data Acquisition & Processing Repor
- Page 5 and 6: III. Equipment Vessel The NOAA Ship
- Page 7 and 8: Vessel Positioning & Orientation Th
- Page 9 and 10: emoved remaining fliers, as well as
- Page 11 and 12: V. Corrections to Echo Soundings In
- Page 13 and 14: with the Trimble DMS 132 receiver.
- Page 15 and 16: Static draft observations were made
- Page 17 and 18: Assessment of Sensor Calibrations E
- Page 19 and 20: Approval Sheet (Separate Signed Doc
- Page 21 and 22: EM1002 installation parameters NOAA
- Page 23 and 24: EM1002 runtime parameters NOAA SHIP
- Page 25 and 26: Hydrographic Systems Inventory Crui
- Page 29 and 30: POS/MV Set-up EM1002 COM1 Baud Rate
- Page 31 and 32: Gps Receiver ConfiguratioinPrimary
- Page 33 and 34: talker ID $IN Roll Sense Port Up Pi
- Page 35 and 36: Baseline Vector -2.259 0.024 -0.002
- Page 47 and 48: APPENDIX E: Vessel Configurations &
- Page 49 and 50: Manufacturer: Model: em1002 Serial
- Page 51 and 52: Entry 3) Draft: 0.002 Speed: 7.911
- Page 53 and 54:
DeltaY: 0.811 DeltaZ: 1.676 SVP #2:
- Page 55 and 56:
Offset: 0.000 Manufacturer: (null)
- Page 57 and 58:
Pitch Offset: 0.000 Roll Offset: 0.
- Page 59 and 60:
Detailed Discussion of Error Estima
- Page 61 and 62:
Sound Velocity Measured Error: 0.05
- Page 63:
APPENDIX F: CARIS Processing Flow C
- Page 70 and 71:
U.S. Department of Commerce Nationa
- Page 72:
DESCRIPTION NORTHING* EASTING* ELEV
- Page 78 and 79:
APPENDIX I: Multibeam Calibration P
- Page 80 and 81:
Pre-calibration Survey Information
- Page 82 and 83:
Dynamic Draft Survey (Vessel waterl
- Page 84 and 85:
The hydrographer performed the bias
- Page 86 and 87:
Caris Vessel Configuration File Nam
- Page 88 and 89:
Pre-calibration Survey Information
- Page 90 and 91:
Dynamic Draft Survey (Vessel waterl
- Page 92 and 93:
Tide Correction Predicted tides app
- Page 94 and 95:
APPENDIX J: CO-OPS Tide Requirement
- Page 96 and 97:
Commanding Officer (or Team Leader)
- Page 98 and 99:
“I905NF2009CORP” for this proje
- Page 100 and 101:
100
- Page 102 and 103:
102
- Page 104 and 105:
104
- Page 106 and 107:
106
- Page 108 and 109:
APPENDIX K: CARIS Quality Control R
- Page 110 and 111:
BASE Surface QC Report H12006 -----
- Page 112 and 113:
112
- Page 114 and 115:
APPENDIX M: NF-09-01-USVI Cruise In
- Page 116 and 117:
21 March (Saturday): VIP Boarding:
- Page 118 and 119:
(latency) between the time position
- Page 120 and 121:
the bridge. Once the ship is on sta
- Page 122 and 123:
Clearance needs to be obtained to c
- Page 124 and 125:
OMAO.Customer.Satisfation@noaa.gov
- Page 126 and 127:
Figure 1: Puerto Rico Priority (mul
- Page 128 and 129:
128
- Page 130 and 131:
130
- Page 132 and 133:
132
- Page 134:
134