04.12.2012 Views

Data Acquisition and Processing Report (DAPR) - Center for Coastal ...

Data Acquisition and Processing Report (DAPR) - Center for Coastal ...

Data Acquisition and Processing Report (DAPR) - Center for Coastal ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Navigation<br />

Error: 4.0<br />

Definition: Navigation is the st<strong>and</strong>ard deviation associated with<br />

the measurement of positions <strong>for</strong> the vessel in meters.<br />

Discussion: Navigation is based on POS/MV manufacturer<br />

specifications.<br />

Timing Transducer<br />

Error: 0.0<br />

Definition: Timing Transducer is the st<strong>and</strong>ard deviation of<br />

transducer time stamp measurements.<br />

Discussion: Timing Transducer is not known <strong>and</strong> is currently being researched.<br />

Navigation Timing<br />

Error: 0.0<br />

Definition: Navigation Timing is the st<strong>and</strong>ard deviation of<br />

navigation time stamp measurements.<br />

Discussion: Navigation Timing is not known <strong>and</strong> is currently being researched.<br />

Gyro Timing<br />

Error: 0.01<br />

Definition: Gyro Timing is the st<strong>and</strong>ard deviation of gyro time<br />

stamp measurements.<br />

Discussion: Gyro Timing is based on POS/MV manufacturer<br />

specifications.<br />

Heave Timing<br />

Error: 0.01<br />

Definition: Heave Timing is the st<strong>and</strong>ard deviation of heave time<br />

stamp measurements.<br />

Discussion: Heave Timing is based on POS/MV manufacturer<br />

specifications.<br />

Pitch Timing<br />

Error: 0.01<br />

Definition: Pitch Timing is the st<strong>and</strong>ard deviation of pitch time<br />

stamp measurements.<br />

Discussion: Pitch Timing is based on POS/MV manufacturer<br />

specifications.<br />

Roll Timing<br />

Error: 0.01<br />

Definition: Roll Timing is the st<strong>and</strong>ard deviation of roll time<br />

stamp measurements.<br />

Discussion: Roll Timing is based on POS/MV manufacturer<br />

specifications.<br />

60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!