06.11.2015 Views

MILLER Newsletter 2015 Final with cream Small

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

IDENTIFY, AIM, EXECUTE<br />

DRIVEN TO BE THE BEST<br />

Maritimes Operations<br />

MRDC - Maritime Road Development Corp - Fredericton, NB<br />

During the 2014 season, MRDC was proud to announce and enter into a unique three (3) year paving contract <strong>with</strong> MacDonald<br />

Paving & Construction Ltd. This contract is scheduled to be administered over the 2014, <strong>2015</strong>, and 2016 paving season and covers<br />

the eastern part of MRDC`s highway facility.<br />

Work during the 2014 season consisted of hot mix asphalt (Type D surface mix, PG 58-28) supplied and placed by MacDonald<br />

Paving crew and asphalt was milled by ICM. ICM is contracted to reinstate rumble strips throughout the facility.<br />

Southeastern United States Operations - Atlanta GA<br />

The Miller Group U.S. covers a vast market area that encompasses 7 states: Alabama, Florida, Georgia, North Carolina, South Carolina,<br />

Tennessee, and Mississippi. This area is approximately 343,120 square miles (888,677 square kilometers), <strong>with</strong> a population of<br />

56.7 million. In comparison the Province of Ontario is 415,600 square miles (1,076,399 square kilometers) <strong>with</strong> a population of 13.6<br />

million. To monitor and track this market for available cold planing, reclaiming, and stabilization is quite a task <strong>with</strong> not only the<br />

states’ D.O.T.’s but also local municipalities and county governments.<br />

Thankfully, The Miller Group has built a reputation <strong>with</strong> its clients over the last 28 years to keep everyone informed of projects<br />

which we can be of service. This reputation has been built <strong>with</strong> the loyal, dedicated employees that have an average length of<br />

employment <strong>with</strong> Miller of 11.6 years. These employees have made numerous personal sacrifices, most importantly the extended<br />

time away from home and families to ensure projects were completed on time, in budget and the customers were completely<br />

satisfied. This work consists of hourly/daily projects to massive interstate total removal/micro-milling to large (20 miles) full depth<br />

reclamation to small parking lot/private projects.<br />

Volume of business improved over prior years by almost 50% and the Miller dedicated professionals performed this work <strong>with</strong>out<br />

a single employee personal injury or vehicle accident. This is an achievement that is a true indicator of professionalism and an<br />

accomplishment that all are most proud.<br />

Brian Morton, MRDC`s Engineering Technician and field<br />

representative reported that in this first year of the three<br />

year contract, the paving operations were performed effectively<br />

and efficiently. This year’s success was largely due<br />

to MacDonald`s Paving field manager, Mr. Jamie Perrin,<br />

who always maintained a very professional manner and<br />

got along well <strong>with</strong> all personnel, this trait and attitude<br />

produced excellent results.<br />

MRDC would like to thank the crews and personnel<br />

of both MacDonald Paving & Construction<br />

Ltd. and ICM who helped in this season’s success.<br />

Have a great and safe 2014-<strong>2015</strong> winter season for<br />

the staff of MRDC Operations Corporation.<br />

68 <strong>MILLER</strong> / McASPHALT NEWSLETTER <strong>2015</strong> EDITION<br />

<strong>MILLER</strong> / McASPHALT NEWSLETTER <strong>2015</strong> EDITION<br />

69<br />

www.millergroup.ca<br />

www.mcasphalt.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!