27.07.2016 Views

Fiji

yqgk302EGjo

yqgk302EGjo

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FIJI Post-Disaster Needs Assessment<br />

Activity<br />

Responsible Agency<br />

Cost<br />

(F$ million)<br />

Professional development training of building inspectors MoIT/MoH/MLGHE 1.8<br />

House addressing system in affected cane farming areas MoS/ FSCL 0.2<br />

House addressing system in affected peri-urban informal settlements MLGHE/MoL/PCN 0.2<br />

Replace minimum household goods and school uniform (destroyed houses<br />

only)<br />

Prepare and pre-approve 4-6 'model' houses (one room starter that can be<br />

incrementally expanded over many years) with materials list and specifications<br />

for voluntary uptake by hhds<br />

Reconstruct 11,030 to starter house/core unit<br />

Reconstruct 11,030 to build back better standards<br />

Initial repairs to critical elements (partial roof) of major damage houses<br />

Initial repairs to critical elements (partial roof) of minor damage houses<br />

MOF/Individual Households/FNPF 53.8<br />

MoIT/MLGHE/MRMD&NDMO/<br />

HfHF/MTCT (Rotahomes)/FIE/MRH<br />

MoIT/MLGHE/MRMD/NDMO/<br />

Individual Households<br />

MoIT/MLGHE/MRMD/NDMO/<br />

Individual Households<br />

MoIT/MLGHE/MRMD/NDMO/<br />

Individual Households<br />

MoIT/MLGHE/MRMD/NDMO/<br />

Individual Households<br />

30,369 household repairs toolkit GoF with support from NGOs and<br />

Donors<br />

Prepare and pre-approve 2 wet area designs with materials lists and specs<br />

GoF with support from Development<br />

partners<br />

Reconstruct 11,030 water and shower units MoH/MRMD/NDMO/households 36.2<br />

Transportation to Viti Levu GoF 1.2<br />

Transportation to Vanua Levu GoF 1.2<br />

Transportation to Maritime islands GoF 1.0<br />

Source: Estimations by Assessment Team.<br />

Table 91: Recovery and Reconstruction Needs for Transport<br />

Activity<br />

Responsible Agency<br />

0.1<br />

77.2<br />

490.6<br />

26.9<br />

135.6<br />

13.2<br />

0.1<br />

Cost<br />

(F$ million)<br />

Total Recovery and Reconstruction Needs 177.9<br />

Recovery Needs 3.2<br />

Restoring full access and connectivity through affected road sections FRA 2.8<br />

Salvage grounded vessels Private sector 0.3<br />

Clear debris from runways and rebuild security fences AFL 0.05<br />

Reconstruction Needs 174.7<br />

Reconstruction of bridges, crossings, culverts, and approaches. Repair of<br />

associated facilities.<br />

FRA 131.2<br />

Reconstruction of rural jetties FRA 37.0<br />

Repair of aids to navigation MSAF 2.3<br />

Repair of port terminal buildings FPCL 0.8<br />

Repair of airport terminal buildings AFL 3.4<br />

Source: Estimations by Assessment Team.<br />

Tropical Cyclone Winston, February 20, 2016<br />

135

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!