CHAPTER 15 THE BIG PICTURE AND THE TEN DELIVERABLES 347<br />

<br />

<strong>to</strong> eliminate or mitigate the impact.<br />

<br />

prior <strong>to</strong> shutting down the database.<br />

<br />

<br />

<br />

<br />

comes <strong>to</strong> shut down the database.<br />

<br />

<br />

Another example of a “simple task” that can quickly become complicated is resetting<br />

a password. Metalink note 270516.1 explains the lengthy sequence of tasks that must be<br />

performed <strong>to</strong> change the password.<br />

Structure of an SOP<br />

In the following sections, I describe an SOP template that can be cus<strong>to</strong>mized <strong>to</strong> each site’s<br />

specific requirements and standards. Each SOP may be divided in<strong>to</strong> the following sections.<br />

Overview<br />

The overview section is provided not so much for the benefit of those executing the SOP<br />

but for all those who are peripherally involved, such as cus<strong>to</strong>mers who need the work<br />

done and managers or teams responsible for scheduling, approving, or supervising the<br />

work. A minimum of technical jargon should be used, and technical details should be<br />

suppressed if appropriate. The following points should be addressed:<br />

Purpose: This is the key section for nontechnical reviewers or managers.<br />

Risks: A clear description of risks helps in getting approvals <strong>to</strong> perform the task—it<br />

also helps educate the performer. There can even be risks if the task is not performed.<br />

Labor and billing: This section specifies the “standard fee schedule” which is the<br />

standard number of labor hours required <strong>to</strong> complete the work. In cases where<br />

a standard fee schedule cannot easily be constructed because of the variability<br />

of the work, guidelines are provided for estimating the work. In some cases, it is<br />

appropriate <strong>to</strong> specify billing details (for example, interdepartmental billing).