21.06.2017 Views

EDC 2014 SR (UPDATED)

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>EDC</strong> <strong>2014</strong> Performance Report<br />

<strong>2014</strong> may be viewed as the year when<br />

your company started reaping the sweet<br />

fruits of the sensible investments that “it made through the years.<br />

”<br />

<strong>2014</strong> Financial Highlights<br />

A number of events contributed to<br />

the phenomenal financial results for<br />

<strong>2014</strong>. Among others is the full-year<br />

operation of our Bacman facility,<br />

which provided an additional ₱3.0<br />

billion to this year’s revenues, the<br />

partial commercial operation of both<br />

our Nasulo and Burgos projects that<br />

added their combined revenues of<br />

₱0.9 billion, with the Nasulo operation<br />

also resulting in the net impairment<br />

recovery of ₱1.8 billion from previously<br />

written-off values in Northern Negros.<br />

To add to that, we also included<br />

insurance proceeds amounting to<br />

₱0.6 billion, representing the partial<br />

collection of our insurance claims that<br />

arose from past events that included<br />

Typhoons Yolanda, Sendong, and<br />

Glenda.<br />

Revenues in <strong>2014</strong> reached ₱30.9<br />

billion, representing a 20% growth<br />

from last year’s ₱25.7 billion. With the<br />

exception of First Gen Hydro Power<br />

Corporation, whose revenues for<br />

<strong>2014</strong> of ₱1.6 billion were lower by<br />

₱0.9 billion compared to the previous<br />

year, all our business units contributed<br />

positively to this year’s higher<br />

revenues. Starting with our Bacman<br />

Geothermal Business Unit (BGBU)<br />

that yielded revenues of ₱3.0 billion,<br />

25.7<br />

Revenues<br />

(in ₱ billion)<br />

20%<br />

30.9<br />

our LGBU that increased its revenues<br />

from ₱13.9 billion a year ago to ₱15.6<br />

billion in <strong>2014</strong>, and our Negros Island<br />

Geothermal Business Unit (NIGBU)<br />

that likewise improved its revenues by<br />

₱0.9 billion mainly on account of the<br />

operations of the Nasulo project. And<br />

for the first time in many years, our<br />

Mount Apo Geothermal Business Unit<br />

(MAGBU) in Mindanao has effectively<br />

addressed its steam production<br />

issues, which not only eliminated its<br />

perennial revenues shortfall but has,<br />

in fact, surpassed last year’s revenues<br />

by ₱0.5 billion, from ₱1.9 billion to<br />

₱2.4 billion in <strong>2014</strong>.<br />

Following the improving trend in our<br />

revenues, our recurring net income<br />

(RNI) attributable to <strong>EDC</strong> also showed<br />

2013 <strong>2014</strong><br />

RNI attributable to <strong>EDC</strong><br />

(in ₱ billion)<br />

6.6<br />

40%<br />

9.2<br />

a remarkable 40% jump from ₱6.6<br />

billion in 2013, to ₱9.2 billion this<br />

year. Again, the biggest contributor<br />

to this year’s RNI is our BGBU at ₱1.9<br />

billion, followed by LGBU with a ₱0.6<br />

billion improvement on its RNI while<br />

our NIGBU and MAGBU contributed<br />

a combined ₱0.2 billion improvement<br />

in their respective RNIs.<br />

The <strong>2014</strong> operations also showed<br />

a stronger contribution margin<br />

from each of the business units—the<br />

yardstick by which we measure their<br />

individual financial performance.<br />

LGBU improved its contribution<br />

margin by ₱1.1 billion, from ₱9.0<br />

billion last year to ₱10.1 billion this<br />

year while NIGBU and MAGBU<br />

increased their contribution margins<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!