EDC 2014 SR (UPDATED)
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>EDC</strong> <strong>2014</strong> Performance Report<br />
geothermal and now, wind and<br />
solar energy sources and into<br />
other regions, <strong>EDC</strong> is continuously<br />
reviewing and aligning its operational<br />
presence with the areas’ unique and<br />
evolving biodiversity portfolio to<br />
ensure a balanced and positive coexistence<br />
with these new forms of<br />
renewable energy in these areas and<br />
communities. In <strong>2014</strong>, we entered<br />
an 891-hectare exploration area<br />
in Burgos, Ilocos Norte, for solar<br />
energy under a service contract with<br />
the Department of Energy, and this<br />
does not overlap nor stand adjacent<br />
to any protected area. This brings<br />
the total of new exploration areas at<br />
pre-construction and construction<br />
phases (two areas were entered for<br />
wind exploration in 2013) to 2,921.55<br />
hectares in Ilocos Norte, none of<br />
which surrounds or is adjacent to any<br />
protected area.<br />
We continue to adopt international<br />
Besra (Accipiter virgatus)<br />
NOx, SOx, and other significant emissions<br />
• Emissions were limited only from the operation and maintenance of standby generator sets, fire pumps, black start engines, and other similar sources<br />
• Each source was operated at least 15 min/week for maintenance purposes<br />
• Leyte emissions increased in 2013 due to the additional utilization of generator sets after Typhoon Yolanda last November 2013<br />
Nitrogen Oxides (NOx)<br />
Sulfur Oxides (SOx)<br />
2.51<br />
0.68<br />
1.81<br />
0.000<br />
1.38<br />
0.63<br />
0.005<br />
0.74<br />
0.92<br />
0.63<br />
0.005<br />
0.17<br />
0.04<br />
0.78<br />
0.12<br />
0.000<br />
0.09<br />
Legend:<br />
Bacman<br />
2012 2013 <strong>2014</strong><br />
Carbon Monoxide (CO)<br />
2012 2013 <strong>2014</strong><br />
Sulfur Oxides (SOx)<br />
Leyte<br />
Negros Island<br />
Mount Apo<br />
Nueva Ecija<br />
0.54<br />
0.15<br />
0.39<br />
0.000<br />
0.30<br />
0.13<br />
0.011<br />
0.16<br />
0.20<br />
0.07<br />
0.011<br />
0.06<br />
0.02<br />
0.26<br />
0.04<br />
0.000<br />
0.03<br />
0.01<br />
0.27<br />
0.003<br />
0.02<br />
0.02<br />
0.35<br />
0.01<br />
0.003<br />
11.76<br />
0.78<br />
0.04<br />
0.001<br />
0.05<br />
0.06<br />
1.03<br />
34.90<br />
0.04<br />
11.80<br />
15.56<br />
0.001<br />
2.53<br />
7.52<br />
2.55<br />
3.35<br />
0.79<br />
2.31<br />
2012 2013 <strong>2014</strong><br />
2012 2013 <strong>2014</strong><br />
Waste generated (in tons)<br />
2012 2013 <strong>2014</strong><br />
Waste disposed (in tons)<br />
Type 2012 2013 <strong>2014</strong><br />
584.3<br />
1,420.50<br />
432.29<br />
(+715.14 m 3 ) 1 (+75 m 3 )<br />
Hazardous waste 433.20<br />
1,243.03<br />
(+18 m 3 )<br />
402.916<br />
1,247.9<br />
1,602.54<br />
(+1,901 m 3 )*<br />
1,659.53<br />
Non-hazardous<br />
waste<br />
1,184.99<br />
857.94<br />
(+ 1901 m 3 )*<br />
1,409.08<br />
(+230 m 3 )<br />
1,832.2<br />
3,024.05 2,091.821<br />
(+2,616.14 m 3 )* 1 (+75 m 3 )<br />
TOTAL 1,618.2<br />
2,100.97<br />
(+1,919 m 3 )*<br />
1,811.997<br />
(+230 m 3 )<br />
Notes: Hazardous wastes are transported, treated/recycled and disposed of by a DENR-accredited transporter and treater. Methods of treatment and disposal<br />
are provided by the treater. Recyclable non-hazardous wastes are sold to recyclers through bidding. Residual wastes are disposed of by the company in a landfill<br />
1<br />
Includes bulky wastes generated from Palinpinon (not related to Typhoon Yolanda)<br />
* The amount of waste in the parentheses refers to the waste generated in the aftermath of Typhoon Yolanda and could not conform to the waste metric of<br />
tonnage used here<br />
58<br />
This page contains the following GRI indicator(s):<br />
G4-EN21, G4-EN23.