241 km<br />

12.5 km<br />

25 km<br />

58 km<br />

159<br />

Hospet – Mormugao connectivity improvement<br />

Line doubling is essential for the volume<br />

requirements of port in future<br />

Last mile connectivity is a challenge<br />

Current scenario – single line<br />

Line capacity<br />

14 rakes<br />

Hospet<br />

▪ Work under progress<br />

▪ Estimated completion: 2017<br />

Avg. rakes from port<br />

11 rakes<br />

Tinai ghat<br />

Maximum cargo capacity<br />

Expected demand by 2020<br />

13.5 MTPA<br />

30 MTPA<br />

Castle rock<br />

▪ Forest land to be transferred to<br />

railways, survey under progress<br />

▪ Estimated completion: 2019<br />

Capacity enhancement by doubling line<br />

Avg. rakes from port<br />

45–50 rakes<br />

Maximum cargo capacity >60 MTPA<br />

Kulem<br />

MPT<br />

▪ One of the steepest gradients in<br />

the country make it technically<br />

challenging<br />

▪ Estimate completion: 2019<br />

▪ 10 hectares of land patches to<br />

be acquired<br />

▪ Stalled for past 3 years due to<br />

local political environment<br />

▪ Estimated completion<br />

–<br />