numerosi aspetti riguardanti tutti i processi, relazioni, e caratteristiche di

un progetto architettonico.

Quest’ultimo aspetto conferisce anche agli edifici la capacità di stabilire

collegamenti, loops e produrre effetti in una maniera multi-scalare e multitipologica.

Essi interagiscono anche con il contesto sociale, economico ed ambientale,

essendo contenitori di attività umane. Turin (2003) ha anche sottolineato

la complessità dei processi produttivi di un edificio indicando un numero

di variabili, come la tipologia dei prodotti, la consulenza di professionisti,

e le relazioni contrattuali; individuando almeno 3 modelli di processo; e

mettendo in evidenza oltre 50 “interrelazioni critiche” (anche se nei grandi

progetti di oggi potrebbero essere di più). Inoltre, i processi riguardanti un

edificio possono essere anch’essi caratterizzati da produzioni “ex-situ” dei

diversi componenti, ognuno dei quali con la propria catena di fornitura, che

sono soggette ad un processo logistico dei singoli componenti, poiché il

prodotto finale è nella maggior parte dei casi fissato in un luogo specifico

sul terreno.

La stessa costruzione di un edificio è un processo di manifattura particolare

che richiama diversi metodi di gare d’appalto e sistemi costruttivi sempre

in cambiamento, sviluppati in diversi luoghi, e organizzati con determinati

vincoli, tempistiche e requisiti. La catena di fornitura di un edificio è

anch’essa considerata come socio-tecnicamente frammentata, dal momento

che ogni progetto è caratterizzato da un coinvolgimento di diverse coalizioni

professionali che si formano e riformano per ogni progetto.

La natura del ruolo di queste coalizioni è variabile ed il tipo di relazioni

contrattuali e l’organizzazione gerarchica sono da definire, fino ad un certo

punto, per ogni progetto.

Queste variabili dipendono non solo dal tipo dei progetti, ma anche da una

serie di caratteristiche del contesto. Quest’ultime sono relazionate a contesti

Capitolo II - Metodologia

From those considerations we can say how it is possible to deconstruct and

study various aspects concerning all the processes, relations, characteristics

of an architectural project.

From Nigra (2018): “...This latter aspect confers to buildings also the

ability to establish links, loops and producing effects in a multi-scalar

and multi-nature manner. They also interact with the social, economic,

and environmental context, by being container of human activities. Turin

(2003) also highlighted the complexity of building delivery processes by

pointing out a number of variables, such as nature of products, function

of professionals, and contractual relationships; identifying at least four

models of type of processes; and highlighting over fifty ‘critical relationship’

(in large projects today could be even more), i.e. tendering or contract type,

highlighting therefore different organizational types.

Moreover, building processes are also characterised by on and/or off-site

production of different components – each one characterized by its own

supply chain - which are subjected to a logistic process of individual

components, since the final product is in most of cases fixed on the ground

on a specific site.

The construction itself of a building is a peculiar manufacturing process

that calls for different procurement methods and everchanging building

systems, developed in different places, and organized with specific timings,

constrains and requirements. Building supply chain is also considered as

socio-technical fragmented, since every project is characterized by the

involvement of different professional coalitions that re-form and vary on

each project. The nature of the role of these coalitions is variable and the

type of contractual relations and hierarchical organizations need to be

defined, to a certain extent, for every project.

These variables depend, not only on the type of projects, but also on

several contextual characteristics. These latter are related to political

10