Trafilati e vennero acquistati i terreni ad Est di Via Bertini, compresi tra
il Corso Dante e la ferrovia Torino- Milano (Osi Est). In tali spazi la nuova
proprietà dispose la costruzione di un fabbricato industriale in cemento
armato con tetto a Shed (AECT, Protocollo 1936_1_10179_dt_01).
street, between Dante boulevard and Turin-Milan (Osi-East) railroad, were
bought.
The property in those spaces built an industrial armored concrete building
with sheds roof Archivio edilizio della città di Torino, Protocollo 1936_1_10179_dt_01).
Durante il conflitto, avvenne un’ulteriore espansione verso la ferrovia Torino-
Milano. Venne terminata la stecca lungo Via Bertini in mattoni faccia vista
e tetto composito destinata agli spogliatoi degli operai e allo stoccaggio dei
materiali di lavorazione e venne costruita la stecca con tetto a botte visibile
ancora oggi dal cavalcavia di Corso Dante.
During the war, an additional expansion towards the Turin-Milan railroad
occurred. The stick-building facing Bertini street, made of bricks and hosting
changing and storing rooms, was completed, moreover the barrel vault roof
building was built, and it’s still visible from the overpass of Dante boulevard.
Il dopoguerra e il boom economico, nascita delle Osi-Ghia
Il dopoguerra rappresentò per il comparto industriale un periodo di
transizione. Tra il 1945 e il 1950 vennero completati i lavori di ricostruzione
degli edifici demoliti dai bombardamenti. Il fronte di Corso Dante ed i
magazzini dell’ambito Osi Est vennero riportati allo stato originale così
come oggi lo vediamo.
The postwar period and the economic boom, birth of Osi-Ghia
The postwar period represented for the industry a time of transition.
Between the 1945 and the 1950 the reconstruction of the bombed buildings
was completed. The facade on Dante boulevard and the storage building in
the Osi-east area were restored at their original state, the actual one.
Nel 1947, nell’ambito Osi Ovest, venne ricostruito e ampliato il basso
fabbricato ad 1 piano prospiciente sul corso Dante (fig.5).
In the 1947, in the Osi-West area, the 1 story building facing Dante boulevard
was re-built and expanded (fig.5).
Fig.5: Archivio edlizio della città di Torino, PE1947_1_110017_dt_01