Re-Osi Ghia_Thesis
Master degree thesis developed during the 2 years passed at the Polytechnic of Turin, in collaboration with Danilo Iannetti. March 2019.
Master degree thesis developed during the 2 years passed at the Polytechnic of Turin, in collaboration with Danilo Iannetti. March 2019.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
in base a scelte prese in autonomia rispetto al gruppo di tesi.
Capitolo II - Metodologia
personal choices autonomous from the thesis group research.
- Discussione
In questa fase i progetti verranno comparati in base alle scelte effettuate,
ponendo enfasi sulle differenze tramite il confronto degli schemi adottati
allo stesso modo dell’analisi dei casi studio. Facendo questo sarà possibile
stabilire a quale delle macro-categorie economiche citate all’inizio di questa
tesi i singoli progetti si avvicinino di più, in modo da poter comprendere in
maniera più approfondita l’impatto delle singole scelte sull’iter progettuale.
- Discussion
In this phase the project will be compared according to the taken paths,
emphasizing the differences through observation of the two adopted
schemes, as it was done for the case studies. Therefore, it would be possible
to establish whose economic macro-categories are more related to, cited at
the beginning of this thesis, in order to understand better the single impacts
on the project process.
Facade
treatment
Typology
Density
Permeability
Void/filled
Number
Public
transport
Heavy
mobility
Typology
Private
Area
Public
Influence
Generated
Urban
Central
Urban
peripheric
Rural
SUSTAINABILITY
IMPACT
Light
mobility
Distance
Significance
On going
Planned
River/port
Airport
Railroad
Road
External
Mobility
Internal
green
areas
Connection Volume
with
type
other
aggregation
clusters
Urban
changes
Contest
Charateristics
Concept
Characteristics
Emisphere
Category
INNOVATION
TYPE
Communication
system
Water
system
Characteristics
Infrastructure
Sewage
connection
and
water
treatment
Orientation
Axes
Energy
generation
Building
control
system
Ventilation
system
Lighting
System
Heating
System
Fire
Control
System
Environmental
Control
Systems
Construction
Details
Characteristics
Characteristics
Doors and
windows
Internal
partition
Construction
Systems
Structure
Access
and
Circulation
Architectural
Characteristics
Dimension
Shape
Floor
number
and
height
Aesthetic
Approach
Characteristics
Typology
ACTORS
Characteristics
Geometry
Volume
Shape
Horizontal
(ceiling/floors)
Characteristics
Simmetry
Vertical
(walls)
Roof
Envelope
Pedestrian
access
Main
Access
Other
Foundation
System
Circulation
within
the
building
Circulation
characteristics
Figure 4 on the left: Graphic representation of the categories, innovation, impacts on the project
Figure 5 on the top: Legend of the graphic map on the left
22