DIN EN 16001: Energy Management Systems in Practice - adelphi
DIN EN 16001: Energy Management Systems in Practice - adelphi
DIN EN 16001: Energy Management Systems in Practice - adelphi
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
R NEW ObjECtIvES IN tHE AREA Of GROuP-WIDE <strong>EN</strong>vIRONM<strong>EN</strong>tAl PROtECtION Of bMW GROuP<br />
Strategic objectives Measures Deadl<strong>in</strong>e<br />
<strong>Management</strong> of Resources and Environmental Protection<br />
Breakthrough goal of a 30 %<br />
reduction <strong>in</strong> energy consumption,<br />
VOC, water, process waste water<br />
and solid waste per manufactured<br />
vehicle between 2006 and 2012<br />
(5 % per year)<br />
Increased application of<br />
renewable energies<br />
– More measures to raise employer awareness of energy sav<strong>in</strong>g<br />
potential<br />
– Integration of pilot project f<strong>in</strong>d<strong>in</strong>gs on consumption structures and<br />
energy flows <strong>in</strong> Munich <strong>in</strong> 2008 <strong>in</strong>to all German locations<br />
– Full implementation of “odour-free foundry” at the Landshut plant<br />
by 2010 and the subsequent cont<strong>in</strong>ued reduction of VOC-emissions.<br />
– Decrease <strong>in</strong> dr<strong>in</strong>k<strong>in</strong>g water consumption as a result of recycl<strong>in</strong>g<br />
<strong>in</strong> production and the use of other water categories such as nearsurface<br />
ground water<br />
Evaluate and promote the option of us<strong>in</strong>g w<strong>in</strong>d and geothermal<br />
energy at various locations<br />
Waste management Integrate the locations Goodwood and Rayong <strong>in</strong>to the waste<br />
<strong>in</strong>formation system of the BMW group<br />
Nature conservation and<br />
biodiversity<br />
Efficient transport logistics<br />
Increase percentage of lowemission<br />
transport modes<br />
Tip<br />
As examples, three environmental programmes from the environmental statements of<br />
different organisations are given below:<br />
Develop a biodiversity <strong>in</strong>dicator for the entire network of the<br />
BMW group<br />
Development of supply concepts from global procurement sources<br />
to the BMW group’s production sites by tak<strong>in</strong>g <strong>in</strong>to consideration<br />
susta<strong>in</strong>able, environmentally friendly transport modes<br />
Optimisation of transport volumes Development of concepts on traffic reduction (load factor) and traffic<br />
relocation to more environmentally friendly carriers.<br />
Environmental programme from the Environmental Statement 2008 of the BMW Group 18<br />
18 Bayrische Motoren Werke (BMW) (ed.) (2008): Susta<strong>in</strong>able Value Report 2008. Munich. Available at<br />
http://www.upj.de/fileadm<strong>in</strong>/user_upload/MAIN-dateien/Aktuelles/Nachrichten/bmw_svr_2008.pdf<br />
2010<br />
2009 / 2010<br />
2010<br />
Ongo<strong>in</strong>g<br />
2010<br />
2011<br />
2011<br />
2009<br />
2009<br />
41