DIN EN 16001: Energy Management Systems in Practice - adelphi
DIN EN 16001: Energy Management Systems in Practice - adelphi
DIN EN 16001: Energy Management Systems in Practice - adelphi
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
80<br />
R <strong>EN</strong>ERGy MANAGEM<strong>EN</strong>t SyStEM CHECklISt<br />
* No. analogical to the progression with regard to contents of <strong>DIN</strong> <strong>EN</strong> <strong>16001</strong><br />
No.* Required Elements<br />
78 Were measures formulated to prevent non-compliance?<br />
79 Were these measures reviewed and their outcome documented?<br />
80 Were results of the audit documented and reported to the management?<br />
E. <strong>Management</strong> review of the EnMS<br />
E.1 General<br />
81 Was the EnMS reviewed <strong>in</strong> planned <strong>in</strong>tervals?<br />
82<br />
83<br />
Was the effectiveness of EnMS, as well as the energy policy, taken <strong>in</strong>to<br />
consideration <strong>in</strong> this case?<br />
Were all the <strong>in</strong>troductory parameters mentioned <strong>in</strong> 3.6.2 of the standard<br />
taken <strong>in</strong>to consideration for the management review?<br />
E.2 Output of the management review<br />
84<br />
85<br />
Were measures for improv<strong>in</strong>g the energy performance s<strong>in</strong>ce the last<br />
review taken <strong>in</strong>to consideration?<br />
Were measures for chang<strong>in</strong>g energy policy, as well as other aspects of<br />
the EnMS, considered?<br />
86 Was the provision of resources taken <strong>in</strong>to consideration?<br />
Implementation<br />
yes / No<br />
Comments