Form 2800- Issuing Office<br />

14 (August<br />

1985) UNITED STATES<br />

DEPARTMENT OF THE 1NTERIOR Tonopah Field Office<br />

BUREAU OF LAND MANAGEMENT<br />

Serial Number<br />

RIGHT-OF-WAY GRANTITEMPORARY” °‘T N-88391- Short-term<br />

1. A (right-<strong>of</strong>-way) is hereby granted pursuant to:<br />

a. Title V <strong>of</strong> the Federal <strong>L<strong>and</strong></strong> Policy <strong>and</strong> Management Act <strong>of</strong> October 21, 1976 (90 Stat.<br />

2776; 43 U.S.C. 1761).<br />

b. D Section 28 <strong>of</strong> the Mineral Leasing Act <strong>of</strong> 1920, as amended (30 u.s.c. 185);<br />

c. J Other (describe)<br />

2. Nature <strong>of</strong> Interest:<br />

a. By this instrument, the holder(s) Ormat Nevada, Inc. receives a right to, construct,<br />

maintain, <strong>and</strong> terminate a(n) access road <strong>and</strong> 120 kV Transmission Line Corridor on<br />

public l<strong>and</strong>s (or Federal l<strong>and</strong> for MLA Rights-<strong>of</strong>-Way) described as follows:<br />

Mount Diablo Meridian, Nevada<br />

See attached legal descriptions<br />

commonly known as the 120 kV Transmission Line<br />

Temporary access road <strong>and</strong> transmission line corridor for construction purposes only.<br />

b. The right-<strong>of</strong>-way granted herein is 110-feet wide, 115,051.20 feet long or 21.79 miles in<br />

length. The right-<strong>of</strong>-way contains 289.7 acres, more or less.<br />

c. This instrument shall terminate on December 31, 2012, 3 years from its effective date unless,<br />

prior thereto, it is relinquished, ab<strong>and</strong>oned, terminated, or modified pursuant to the terms <strong>and</strong><br />

conditions <strong>of</strong> this instrument or <strong>of</strong> any applicable Federal law or regulation.<br />

d. This instrument may be renewed. If renewed, the right-<strong>of</strong>-way or permit shall be subject to<br />

the regulations existing at the time <strong>of</strong> renewal <strong>and</strong> any other terms <strong>and</strong> conditions that the<br />

authorized <strong>of</strong>ficer deems necessary to protect the public interest.<br />

e. Notwithst<strong>and</strong>ing the expiration <strong>of</strong> this instrument or any renewal there<strong>of</strong>, early<br />

relinquishment, ab<strong>and</strong>onment, or termination, the provisions <strong>of</strong> this instrument, to the extent<br />

applicable, shall continue in effect <strong>and</strong> shall be binding on the holder, its successors, or<br />

assigns, until they have fully satisfied the obligations <strong>and</strong>/or liabilities accruing herein before<br />

or on account <strong>of</strong> the expiration, or prior termination, <strong>of</strong> the grant.